My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150394 Approval Letter
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
C150394 Approval Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2015 1:24:58 PM
Creation date
5/28/2014 1:16:26 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-132
C150394
Contractor Name
Farmers Pawnee Canal Company, The
Contract Type
Loan
County
Logan
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CWCB Water Project Loan Program <br /> Project Data Sheet C150394 <br /> Borrower: Farmers Pawnee Canal Company County: Logan <br /> Project Name: Diversion Structure Replacement Project Type: Diversion Structure <br /> Project <br /> Drainage Basin/District: South Platte/64 Water Source: South Platte River <br /> Total Project Cost: $2,047,000 Funding Source: Construction Fund <br /> Type of Borrower: Agricultural Average Annual Diversion: 27,956 AF <br /> CWCB Loan: $2,067,470 Interest Rate: 1.75%Term: 30 years <br /> (with 1% service fee) <br /> The Company provides irrigation water to a 10,000 acre service area, extending from one mile <br /> south of Merino to four miles north of Sterling along the west side of the South Platte River. The <br /> Company's diversion structure is 218-foot long rollover diversion dam that spans the width of <br /> the river. Adjacent to the dam is the Company's 40-foot canal headgate structure. Both <br /> structures were originally built in 1926. After the September 2013 flood, the river began to <br /> undermine the structures. Attempts to repair the structures with additional steel sheet piling and <br /> concrete were not successful and the undermining worsened. The Company intends to rebuild the <br /> diversion dam and canal headgate. Replacement of the diversion dam provides the Company <br /> with an opportunity to utilize an improved design and alleviate an ongoing maintenance issue of <br /> sand accumulation within the canal. Construction is expected to occur in the fall/winter of <br /> 2014/2015. ' ■''' . 4 r <br /> ro <br /> $ <br /> �,. _ j . 514,, . .,, ,4I <br /> a v <br /> 'ff r ' , '4 ' ' ,.4f ' 44-r' it',.."' °.: 4.'"-' _ <br /> r ,,,, <br /> , „. ",/ - .1.r. ..,8,..v,„ <br /> rT\ <br /> , ., <br /> FARMERS ,, _ I )',t . * r <br /> I <br /> A <br /> i <br /> ,, I , <br /> "`--°ATWOOD, <br /> Ati. <br /> 1 P 41 11 F. <br /> CCATION i ilt 1 <br /> t SU"JTH <br /> `i'J ;00,/ r MERIM1kC) ,,I PI ATTF <br /> f ■f RIVER , , <br />
The URL can be used to link to this page
Your browser does not support the video tag.