Laserfiche WebLink
Ephraim Ditch Company Agenda Item 32c <br /> May 9,2014(Updated May 23,2014) <br /> Page 3 of 4 <br /> Water Rights <br /> The water rights impacted by this project are shown in Table 1: <br /> TABLE 1: EPHRAIM DITCH COMPANY WATER RIGHTS <br /> IDecreed Name Amount(CFS) Appropriation Date Adjudication Date <br /> Ephraim Ditch 47.0 03/28/1881 10/22/1883 <br /> Average annual surface diversions of the Company over the past 10 years are 4,100 AF (0.08 AF <br /> per share). The Company also owns five irrigation wells completed in the confined aquifer that are <br /> used as a supplemental source of irrigation water for its shareholders. Use of these wells to <br /> supplement surface water will become more restrictive and expensive with the implementation of <br /> Ground Water Use Rules and sub-districts within Division 3. <br /> Project Description <br /> The purpose of this Project is to address the need for a well-designed diversion structure that will <br /> reduce maintenance, improve water management efficiencies, and allow for the accurate control of. <br /> compact-entitled waters. The core of the Ephraim Ditch diversion structure has been washed away <br /> over time, contributing to decades of limited diversion to irrigators and potential over payment to <br /> the Compact. Currently, irrigators divert their water right by piling debris such as tree trunks or <br /> cinderblocks to act as the diversion dam. The Project, in conjunction with the District's CMP, seeks <br /> to eliminate this practice. <br /> Alternative 1 -No Action: Due to the deteriorated rock and rubble diversion structure, this <br /> alternative was not considered further. The ability to divert the Company's water rights will become <br /> more diminished as the already deteriorated structure continues to deteriorate. It is not feasible for <br /> the Company to rely on its irrigation wells to make up for its surface rights. <br /> Alternative 2—Repair Existing Structure: The existing rock and rubble piles of debris offer no <br /> possibility of repair. This alternative was not considered further. <br /> Selected Alternative 3—Remove and Replace All Existing Structures:This alternative will remove <br /> and replace the diversion and headgate structures. The new headgate will be automated and five <br /> gauging stations will be installed. Additionally, measurement structures and telemetry will be <br /> installed at five locations within the ditch to accomplish water management efficiency goals. This <br /> alternative meets the Project's goals and has an estimated cost of$201,500 as shown in Table 2. <br /> TABLE 2: PROJECT COST SUMMARY <br /> Task CMP Cost Ephraim's <br /> Project Cost <br /> Engineering and Administration $91,000 $32,000 <br /> Construction $480,000 $164,000 <br /> Telecommunications $11,000 $5,500 <br /> Total $582,000 $201,500 <br /> Schedule: Final design is scheduled to be completed in summer 2014, with construction expected to <br /> start around July 2015. Construction is expected to be completed by December 2015. <br />