Laserfiche WebLink
CWCB Water Project Loan Program <br /> Project Data Sheet C150399 <br /> Borrower: Fulton Irrigation Ditch Company County: Adams <br /> Project Name: Diversion Structure Rehabilitation Project Type: Diversion Rehabilitation <br /> Project <br /> Drainage Basin/District: South Platte/2 Water Source: South Platte River <br /> Total Project Cost: $2,230,000 Funding Source: Construction Fund <br /> Type of Borrower: Blended Average Annual Diversion: 29,684 AF <br /> CWCB Loan: $2,027,070 Interest Rate: 2.45% Term: 30-years <br /> (with 1% service fee) <br /> The purpose of the Project is to replace the Company's South Platte River diversion gates and <br /> rehabilitate the existing trash rack. The Project will also include the reconstruction of the Branch <br /> Ditch Diversion Structure on the Fulton Ditch. The Company diverts South Platte River water <br /> near 100th Ave. in Commerce City to a 38,000 acre service area. Sago pond weed in the South <br /> Platte River has escalated and is beginning to obstruct the flow of water through the existing <br /> trash rack. Construction is expected to occur in the fall/winter of 2014/2015. <br /> ' BRANCH <br /> _. DITCH n ` - E 36TH AVE <br /> • �t ; a f .. DIVERSION " 1,`. j <br /> 1„ 9 NI , <br /> AVE <br /> r J4 <br /> fir m <br /> - <br /> F <br /> r <br /> ; <br /> c' <br /> ''''fat, ' -•,. ,.,44 d'' F., <br /> . p t X16 1f <br /> ' w 'r r — <br /> 1 f e _ � <br /> °4 <br /> a .� r _ a <br /> P�s <br /> Jy 6 ' <br /> / <br /> 7-- . FULTON + y . <br /> ��. e �- ., , DITCH ---,.J , _..�. { <br /> u "1 4 HEADWORKS a-, <br /> fT. <br /> . ,,i <br />