My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150398 Approval Letter
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
C150398 Approval Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2015 7:37:26 AM
Creation date
5/28/2014 1:11:53 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-151
C150398
Contractor Name
Louden Irrigating Canal & Reservoir Company
Contract Type
Loan
Water District
4
County
Larimer
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CWCB Water Project Loan Program <br /> Project Data Sheet C 150398 <br /> Borrower: Louden Irrigating Canal County: Larimer <br /> and Reservoir Company <br /> Project Name: Emergency Diversion Structure Project Type: Ditch Rehabilitation <br /> and Ditch Repair <br /> Drainage Basin/District: South Platte/4 Water Source: Big Thompson River <br /> Total Project Cost: $215,000 Funding Source: Severance Tax PBF <br /> Type of Borrower: Blended Average Annual Diversion: 8,000 AF <br /> CWCB Loan: $161,600 Interest Rate: 2.70%Term: 30-years <br /> (with 1% service fee) (25%Ag,<1%Low,61%Mid,8%High,6%Corn) <br /> During the unprecedented flood of September 2013 in the tributaries to the South Platte River, a <br /> significant number of diversion structures and dams along the river corridor were damaged, <br /> including the Company's river diversion. The ditch was diverting water as the September storm <br /> started. As the flood progressed, the headgates could not be safely reached for operations. Water <br /> overtopped the headgate structure by at least 4 feet resulting in damage to the headgate an d ditch <br /> system. The first 3,000 feet of the ditch were totally filled with silt and debris. The ditch <br /> breached back to the river in two places and undercutting caused slides that threatened the ditch. <br /> Phase 1 will clean and rebuild the ditch and service road, and salvage the existing headgates to <br /> ensure general operation for the 2014 irrigation season. Phase 2 will replace the existing <br /> headgates with gates that are safer, more accurate, and capable of remote operation. <br /> Charles ta,,, Fort Coll i ns E hWtben' '4 <br /> State <br /> Park' <br /> DRAKES � <br /> r <br /> Te'hnnath Severance Tuber <br /> HARMONY it <br /> Horsetoath <br /> Heights <br /> ■ <br /> R87.: Redmond Windsor <br /> 8rxewef <br /> Site Location o <br /> River Diversion <br /> as <br /> W 1n St Lovel <br /> sri <br /> e .�rre Nu,r"4 T? <br /> € 37i , , <br /> Camp <br /> +' <br /> -„6„..., . - trI:e" '- - <br /> pyre i ......_+.d---!"''""`' .��4 . ._-:o'''''-- <br /> 287' ` .,. :` <br />
The URL can be used to link to this page
Your browser does not support the video tag.