Laserfiche WebLink
CWCB Water Project Loan Program <br /> Project Data Sheet C150411 <br /> Borrower: Denver Southeast Suburban Water County: Douglas <br /> and Sanitation District(dba <br /> Pinery Water and Wastewater District) <br /> Project Name: Water Infrastructure and Supply Project Type: New Water Supply <br /> (WISE)Efficiency Project <br /> Drainage Basin/District: South Platte/8 Water Source: South Platte <br /> Total Project Cost: $10,920,000 Funding Source: Construction Fund <br /> Type of Borrower: High-income Municipal Average Annual Delivery: 2,837 AF <br /> CWCB Loan: $9,926,280 (with 1% service fee) Interest Rate: 3.00%Term: 30 years <br /> In 1965,the District was formed as the Denver Southeast Suburban Water and Sanitation District. The <br /> District has been providing water and wastewater services since 1971 to its predominately residential <br /> customers. <br /> The District will participate in Parker's WISE infrastructure components including 20,300 feet of new <br /> 42-inch pipeline from near the intersection of Chambers Road and E-470 to the Parker Water <br /> Treatment Plant located just south of Rueter-Hess Reservoir. At the Parker Water Treatment Plant site <br /> a new 16.5 million gallons per day pumping station will be constructed. Downstream of the pumping <br /> station 9,000 feet of new 24-inch pipe will be constructed that will allow WISE water to be conveyed <br /> to Reuter-Hess Reservoir for storage. In addition, Pinery will construct about 6,200 feet of 12-inch <br /> pipeline to deliver water to an existing finished water distribution system pumping station. <br /> The WISE Project is the result of regional cooperative planning efforts between Denver Water, Aurora <br /> Water, and 10 regional water providers in the south metropolitan tan area. The South Metro WISE <br /> Authority(WISE Authority) is comprised of ten governmental water providers in Douglas and <br /> Arapahoe Counties bound together by a 2013 Intergovernmental Agreement. The WISE Project will <br /> reduce dependence on non-renewable groundwater resources. <br /> 0 <br /> aerwa+ w <br /> al -�, <br /> . Greenwood V.lage et x <br /> .cry 41 E.CCV Western <br /> c Seacipshos P4 <br /> t Pipeline <br /> S Cent- ,/. <br /> ,., , Rena connection:. <br /> „4 Binney Water <br /> elsghtands Ranch Purification Facility <br /> tore <br /> parker <br /> Pinery Water& <br /> IS <br /> e C ', <br /> Wastewater <br /> -� i Pak t District <br /> Ca5tie <br /> r <br /> itla <br /> N. 0 =Pump Station <br />