Laserfiche WebLink
Parker Water&Sanitation District Agenda Item 30c <br /> May 9,2014(Updated May 23,2014) <br /> Page 3 of 7 <br /> TABLE 1: WISE PARTICIPANTS & DELIVERIES <br /> WISE Authority 10-Year Guar.Delivery Subscription Level <br /> Member tacre-feet per year) <br /> Cottonwood* 4,000 400 <br /> Inverness * 5,000 500 <br /> Parker* 12,000 1,200 <br /> Pinery * 5,000 500 <br /> Rangeview 5,000 500 <br /> Castle Rock 10,000 1,000 <br /> Centennial 10,000 1,000 <br /> Dominion 13,250 1,325 <br /> Stonegate 5,000 500 <br /> Meridian 3,000 300 <br /> Totals 72,250 7,225 <br /> *Entities shown in bold are resquesting CWCB loans. <br /> FACILITIES TO BE CONSTRUCTED OR ACQUIRED FOR THE WISE PROJECT CAN BE CONSIDERED CORE OR <br /> LOCAL COMPONENTS. CORE INFRASTRUCTURE COMPONENTS ARE THOSE DOWNSTREAM OF AURORA'S <br /> BINNEY WATER PURIFICATION FACILITY (BWPF) CLEARWELL AND MASTER METER THAT ARE <br /> NECESSARY FOR SERVICE TO ALL OR MOST OF THE PARTICIPANTS, AND RELATED COSTS THEREFORE ARE <br /> DISTRIBUTED AMONG ALL WISE AUTHORITY PARTICIPANTS ACCORDING TO THEIR COMMITTED DELIVERY <br /> SUBSCRIPTION LEVEL. LOCAL INFRASTRUCTURE COMPONENTS ARE NECESSARY ELEMENTS FOR <br /> INDIVIDUAL OR SMALLER GROUPS OF WISE AUTHORITY PARTICIPANTS: THOSE COSTS ARE THEREFORE <br /> DIRECTLY APPLIED TO THE BENEFITING MEMBERS. THE CWCB LOANS FOR THE OVERALL PROJECT HAVE <br /> BEEN DIVIDED INTO 4 SEPARATE LOANS ACCORDING TO FUNDING,TIMELINE, AND LOCATION: <br /> CONTRACT #1 - EAST CHERRY CREEK VALLEY (ECCV) PIPELINE PURCHASE: DELIVERIES TO THE <br /> WISE AUTHORITY MEMBERS WILL BE BROUGHT SOUTH THROUGH AURORA'S PRAIRIE WATERS <br /> PIPELINE TO A DELIVERY AND MASTER METER POINT LOCATED AT AURORA'S BWPF. SUBSEQUENT <br /> DELIVERY TO AREAS WEST WILL BE MADE VIA THE ECCV WESTERN PIPELINE. THE WISE <br /> AUTHORITY WILL PURCHASE AN 85% OWNERSHIP INTEREST IN THE 15-MILE ECCV WESTERN <br /> PIPELINE, WITH THE REMAINING 15% OWNERSHIP TO BE HELD BY DENVER WATER. ECCV WILL <br /> RETAIN RIGHTS TO CARRYING CAPACITY IN THE PIPELINE. <br /> CONTRACT#2 - PHASE 1 INFRASTRUCTURE: COMPONENTS INCLUDED IN THIS PHASE/LOAN INCLUDE <br /> A TEMPORARY DIRECT CONNECTION TO AURORA'S DISTRIBUTION SYSTEM TO PROVIDE SHORT-TERM <br /> DELIVERIES, AND MODIFICATIONS TO THE ECCV WESTERN PIPELINE NECESSARY TO MAKE WISE <br /> WATER DELIVERIES. LOCAL COMPONENTS CONSIST OF SEVERAL TURNOUTS TO BE CONSTRUCTED TO <br /> DELIVER WATER DIRECTLY TO WISE PARTICIPANTS WITH SYSTEMS ADJACENT TO THE PIPELINE. <br /> ADDITIONAL PUMP STATIONS WILL BE CONSTRUCTED TO DELIVER WATER TO STORAGE IN RUETER- <br /> HESS RESERVOIR AND CONVEY WATER TO PARTICIPANTS LOCATED SOUTH OF RUETER-HESS <br /> RESERVOIR. THIS PHASE INCLUDES TWO PUMP STATIONS, AND 45 MILES OF NEW PIPELINES VARYING <br /> BETWEEN 8-AND 42- INCHES IN DIAMETER. <br /> CONTRACT#3 - PHASE 2 INFRASTRUCTURE: COMPONENTS INCLUDED IN THIS PHASE/LOAN INCLUDE <br /> A PUMP STATION AND PIPELINE FROM THE BWPF TO THE EXISTING ECCV PIPELINE, REPLACING THE <br />