My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WISE Cottonwood Approval Letter
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
WISE Cottonwood Approval Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2016 4:00:57 PM
Creation date
5/28/2014 1:09:12 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-102
CT2015-104
CT2015-105
CT2015-106
C150408A
C150408B
C150408C
C150408D
Contractor Name
Cottonwood Water and Sanitation District
Contract Type
Loan
Water District
8
County
Douglas
Arapahoe
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Cottonwood Water&Sanitation District Agenda Item 30a <br /> May 9,2014(Updated May 23,2014) <br /> Page 3 of 7 <br /> TABLE 1: WISE PARTICIPANTS & DELIVERIES <br /> WISE Authority 10-Year Guar.Delivery Subscription Level <br /> Member (acre-feet) (acre-feet per year) <br /> Cottonwood* 4,000 400 <br /> Inverness * 5,000 500 <br /> Parker* 12,000 1,200 <br /> Pinery * 5,000 500 <br /> Rangeview 5,000 500 <br /> Castle Rock 10,000 1,000 <br /> Centennial 10,000 1,000 <br /> Dominion 13,250 1,325 <br /> Stonegate 5,000 500 <br /> Meridian 3,000 300 <br /> Totals 72,250 7,225 <br /> *Entities in bold are recommended for CWCB loans. <br /> FACILITIES TO BE CONSTRUCTED OR ACQUIRED FOR THE WISE PROJECT CAN BE CONSIDERED CORE OR <br /> LOCAL COMPONENTS. CORE INFRASTRUCTURE COMPONENTS ARE THOSE DOWNSTREAM OF AURORA'S <br /> BINNEY WATER PURIFICATION FACILITY(BWPF)CLEAR WELL AND MASTER METER THAT ARE <br /> NECESSARY FOR SERVICE TO ALL OR MOST OF THE PARTICIPANTS, AND RELATED COSTS THEREFORE ARE <br /> DISTRIBUTED AMONG ALL WISE AUTHORITY PARTICIPANTS ACCORDING TO THEIR COMMITTED DELIVERY <br /> SUBSCRIPTION LEVEL. LOCAL INFRASTRUCTURE COMPONENTS ARE NECESSARY ELEMENTS FOR <br /> INDIVIDUAL OR SMALLER GROUPS OF WISE AUTHORITY PARTICIPANTS,AND ARE DIRECTLY APPLIED TO <br /> THE BENEFITING MEMBERS. THE CWCB LOANS FOR THE OVERALL PROJECT HAVE BEEN DIVIDED INTO <br /> FOUR SEPARATE LOAN CONTRACTS ACCORDING TO FUNDING,TIMELINE,AND LOCATION: <br /> CONTRACT#1 -EAST CHERRY CREEK VALLEY(ECCV)PIPELINE PURCHASE: DELIVERIES TO THE <br /> WISE AUTHORITY MEMBERS WILL BE BROUGHT SOUTH THROUGH AURORA'S PRAIRIE WATERS <br /> PIPELINE TO A DELIVERY AND MASTER METER POINT LOCATED AT AURORA'S BWPF. SUBSEQUENT <br /> DELIVERY TO AREAS WEST WILL BE MADE VIA THE ECCV WESTERN PIPELINE. THE WISE <br /> AUTHORITY WILL PURCHASE AN 85%OWNERSHIP INTEREST IN THE 15-MILE ECCV WESTERN <br /> PIPELINE,WITH THE REMAINING 15%OWNERSHIP TO BE HELD BY DENVER WATER. ECCV WILL <br /> RETAIN RIGHTS TO CARRYING CAPACITY IN THE PIPELINE. <br /> CONTRACT#2-PHASE 1 INFRASTRUCTURE: COMPONENTS INCLUDED IN THIS PHASE/LOAN INCLUDE <br /> A TEMPORARY DIRECT CONNECTION TO AURORA'S DISTRIBUTION SYSTEM TO PROVIDE SHORT-TERM <br /> DELIVERIES,AND MODIFICATIONS TO THE ECCV WESTERN PIPELINE NECESSARY TO MAKE WISE <br /> WATER DELIVERIES. LOCAL COMPONENTS CONSIST OF SEVERAL TURNOUTS TO BE CONSTRUCTED TO <br /> DELIVER WATER DIRECTLY TO WISE PARTICIPANTS WITH SYSTEMS ADJACENT TO THE PIPELINE. <br /> ADDITIONAL PUMP STATIONS WILL BE CONSTRUCTED TO DELIVER WATER TO STORAGE IN RUETER- <br /> HESS RESERVOIR AND CONVEY WATER TO PARTICIPANTS LOCATED SOUTH OF RUETER-HESS <br /> RESERVOIR. THIS PHASE INCLUDES TWO PUMP STATIONS,AND 45 MILES OF NEW PIPELINES VARYING <br /> BETWEEN 8-AND 42- INCHES IN DIAMETER. <br />
The URL can be used to link to this page
Your browser does not support the video tag.