My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150358 Project Summary
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
C150358 Project Summary
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2014 4:47:07 PM
Creation date
5/27/2014 12:24:18 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150358
Contractor Name
Henrylyn Irrigation District
Contract Type
Loan
County
Weld
Loan Projects - Doc Type
Project Summary
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Henrylyn Irrigation District <br /> Prospect Reservoir Dam Facing Project <br /> 11,00` Or <br /> i 2 ill ii 0 i m no mi m 0 mim mew imi im in ismi iii.:, _ ,,„_.„....,„":".:,:(it;rijii j,...)..,.1, , ,,, i 1,!:,1 L::3 1.7:,,,j,;,,,r..,.__i, <br /> l �,. <br /> 44 <br /> ' u �r mu.. <br /> " .�" a «mo ��°e A.:.,m 1 <br /> # . <br /> ✓ «fir.. <br /> . Project Description <br /> The Henrylyn Irrigation District was formed in 1907 under the Irrigation District Law of 1905. The <br /> District consists of 32,745 acres of irrigated farm land in Weld County. Their service area starts <br /> about 2 miles west of Hudson and extends generally east and south along 1-76,to about 9 miles east <br /> of Keenesburg. Prospect Reservoir is an off-stream reservoir constructed in 1914 and has a <br /> Significant Hazard Large (Class 2)Dam with a height of 45 feet, a crest width of 18 feet, and a <br /> length of 5,300 lineal feet. The Prospect Reservoir Dam Facing Project will increase the erosion <br /> protection and dam stability by replacing a deteriorating concrete face at a 2:1 slope with a riprap <br /> face at a 3:1 slope. Construction occurred during the non-irrigation season of 2013/14. Dam Safety <br /> issued an Acceptance of Construction on April 17, 2014. <br /> Project Data <br /> Sponsor: Henrylyn Irrigation District County: Weld Water Source: South Platte River <br /> Terms of Loan: $1,824,204.41 for 30 years @ 1.75% Substantial Completion:June 1,2014 <br /> (Original Approval=$2,967,279.00) <br /> Design Engineer: Duane Smith,P.E.and L.Clint Brown,P.E. <br /> Contractor: Zak Dirt,Inc. <br /> Project Elements: Reface 2:1 concrete slope with 3:1 riprap slope,outlet conduit modifications <br />
The URL can be used to link to this page
Your browser does not support the video tag.