My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150251 Easement
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
C150251 Easement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2014 4:27:41 PM
Creation date
5/21/2014 4:16:44 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150251
Contractor Name
Montezuma Valley Irrigation Company
Contract Type
Loan
County
Montezuma
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
and firewood to remain on the property for use by Maez. Other debris left from trees are to be <br /> put through a chipper. <br /> D. MVIC shall fill and completely cover, original or "first ditch" and shall reclaim <br /> all top soil. MVIC will haul rock and excess dirt to original or "first ditch" and reseed a good <br /> grass mix on all original or "first ditch" and newly constructed pipeline areas. The old flume is <br /> to be pushed into original or"first ditch"and burned. <br /> E. MVIC agrees to control and spray for thistles and weed in all disturbed areas for <br /> (3) three years. <br /> F. MVIC agrees to use approved techniques for erosion control pertaining to any cut <br /> banks any water passage under fills and shall control for thistles and weeds in all disturbed areas. <br /> G. MVIC shall release and quit claim any rights it has to the old easement and shall <br /> obtain all necessary survey's required to obtain the new easements described herein all at <br /> MVIC's sole cost and expense. <br /> III. POST CONSTRUCTION <br /> A. During and at completion of construction, MVIC agrees:to perform noxious weed <br /> and erosion control to NRCS standards along the right-of-way and easement granted for the May <br /> Lateral Irrigation Pipeline. <br /> B. After completion of construction, MVIC will re-seed the right-of-way to reduce <br /> erosion; and MVIC shall be solely responsible for maintaining the access roads, and right-of-way <br /> contemplated by this Agreement. <br /> IV. MISCELLANEOUS <br /> A. The terms and conditions of this Agreement shall specifically survive the transfer <br /> of easements as contemplated herein and completion of the construction as an enforceable <br /> agreement between the parties, and shall inure to the benefit or obligation of the parties' heirs, <br /> successors and assigns. <br /> B. This Agreement is the entire agreement between the parties and shall not be <br /> revoked, modified, or amended without the subsequent written agreement of the parties. <br /> C. This Agreement shall be deemed made and to be performed in Montezuma <br /> County, Colorado, and exclusive jurisdiction and venue shall be with the Courts of Montezuma <br /> County, Colorado. <br /> DONE AND SIGNED the date and year first above written. <br /> MONTEZUMA VALLEY <br /> IRRIGATION COMPANY MAEZ <br /> By: ,Q ul'c. /''`"� '� • <br /> Y <br /> Leonard A. Maez f <br /> Its 1f85cdpn <br /> `, <br /> Edith Maez <br /> � <br /> A. <br />
The URL can be used to link to this page
Your browser does not support the video tag.