Laserfiche WebLink
List of Tables <br /> Table 1. Summary of Greeley Canal No. 3 Direct Flow Water Rights 3 <br /> Table 2. Summary of GIC Storage Water Rights 3 <br /> Table 3. Summary and Prioritized Capital Improvements After Page 6 <br /> Table 4. Project Financial Summary 8 <br /> Table 5. Potential Contractors 8 <br /> List of Figures <br /> Figure 1. Service Area Map Pocket <br /> Figure 2. Straight-line Diagram of Greeley Canal No. 3 4 <br /> Figure 3. GIC Monthly Historic Diversion Record After Page 4 <br /> Figure 4. River Diversion Structure Concept After Page 5 <br /> Figure 5. Modified Gate Structure West of Highway 34 After Page 5 <br /> List of Appendices <br /> Appendix A: Articles of Incorporation and By-Laws 10 <br /> Appendix B: Historic river diversions (tabular) 11 <br /> Appendix C: CWCB Loan Application 12 <br /> Appendix D: Financial Statements and Budgets 13 <br /> Appendix E: Photographs of the Existing Canal 14 <br /> Pocket: Large Scale Service Area Map Pocket <br /> Aqua Engineering, Inc. Greeley Irrigation Company, Feasibility Study <br /> December 2006 - iv - <br />