Laserfiche WebLink
x{ > <br /> • <br /> {,�]1 } <br /> Greeley Irrigation Company <br /> Feasibility Study <br /> Considering <br /> Phased Canal Improvements <br /> FEASIBILITY STUDY APPROVAL <br /> Pursuant to Colorado Revised Statutes 37-60-121 &122,and <br /> in accordance with policies adopted by the Board, the <br /> CWCB staff has determined this Feasibility Study meets all <br /> applicable requirements for approval. / <br /> (1)Signed <br /> Da <br /> Prepared by: <br /> Aqua Engineering, Inc. <br /> 4803 Innovation Drive <br /> Fort Collins, Colorado 80525 <br /> 970.229.9668 <br /> www.aquaengineering.com <br />