My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150172 Final Report
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
C150172 Final Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2014 9:17:41 AM
Creation date
5/14/2014 9:17:17 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150172
Contractor Name
Union Ditch Company
Contract Type
Loan
Water District
2
County
Weld
Loan Projects - Doc Type
Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Table 3. Probable Cost Estimate for Recharge Pond <br /> PRELIMINARY ESTIMATE OF INITIAL PROBABLE COSTS <br /> Low Side Estimate <br /> Storage =50 af Storage=90 af <br /> Financed Costs <br /> Construction Cost Estimate <br /> Recharge site excavation $121,000 $217,800 <br /> Canal improvements/ Pumps 10,000 25,000 <br /> Monitoring/ Flow measurement 50,000 50,000 <br /> TOTAL INITIAL COST $181,000 $292,800 <br /> PRELIMINARY ESTIMATE OF ANNUAL COSTS <br /> Financed Costs <br /> Annual Loan Repayment(P&I) ($8,939) ($14,460) <br /> Plan operation and reporting (4,000) (4,000) <br /> TOTAL ANNUAL COST ($12,939) ($18,460) <br /> TOTAL ANNUAL COST PER WELL ($323) ($461) <br /> Assumptions: <br /> (1)Low side estimate based on 50 acre-feet of storage; high side estimate based on 90 acre-feet of storage. <br /> (2)Excavation costs are estimated to be$1.50/yd of earth removed and left onsite. <br /> (3)Annual loan repayment calculations are based on 2.75%annual percentage rate over a 30-yr loan. <br /> recharge pond(s), canal structural improvements or pumps needed to distribute water <br /> from the Union Ditch to the recharge pond(s), and measurement structures for <br /> monitoring and controlling water inflow to the pond(s). <br /> Low-side and high-side estimates of costs are provided. Site excavation expenses are <br /> based on the development of 20 acre-feet of storage (low-side) and 50 acre-feet of <br /> storage (high-side). It is believed that 50 acre-feet of developed storage is adequate for <br /> this project, but it may be necessary and/or desirable to develop more storage capacity <br /> in the future. Additional anticipated costs not included in this estimate are land <br /> acquisition expenditures and operation and maintenance costs for the project. <br /> Expenditures for canal structural improvements, monitoring, and measurement are <br /> expected to be highly variable depending on what the Union Ditch implements and are <br /> primarily presented in the cost estimate as placeholders. <br /> Aqua Engineering, Inc. Recharge Project Potential <br /> February 17, 2004 - 9- <br />
The URL can be used to link to this page
Your browser does not support the video tag.