My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Gunnison - Lone Cabin Ditch & Reservoir - Dam Rehabilitation_Misc Doc
CWCB
>
WSRF Grant & Loan Information
>
DayForward
>
ARK - GUNNISON
>
Gunnison - Lone Cabin Ditch & Reservoir - Dam Rehabilitation_Misc Doc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2015 3:57:35 PM
Creation date
5/13/2014 9:14:12 AM
Metadata
Fields
Template:
WSRA Grant and Loan Information
Basin Roundtable
Gunnison
Applicant
Lone Cabin Ditch & Reservoir Company
Description
Lone Cabin Dam Rehabilitation
Account Source
Basin
Board Meeting Date
1/28/2014
Contract/PO #
C150529
WSRA - Doc Type
Supporting Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2/19/2A14 <br />e <br />�TATE OF <br />CGLORADa <br />Lone Cabin WSRA Grant <br />State.co.us E�cutire Branch Mail - Lone Cabin WSRA Grarrt <br />Godbout - DNR, Craig <craig.godbout@state.co.us> Tue, Jan 14, 2014 at 9:01 AM <br />To: James Briscoe <hotchlaw@aol.com> <br />Cc: Kirk Russell - DNR <kirk.russell@state.co.us> <br />Jim: <br />Your WSRA application for Lone Cabin is on the CWCB's January 27-28, 2014 agenda. <br />I'll use previous application, Scope of Work, Budget and Schedule for Board review. If I need anything else, or <br />updates, I'll let you know. <br />Kirk Russell and I have spoken and ha� coordinated our efforts. <br />t just want to be certain of what the revision is requesting: An increase of Basin Account funds of $83,150, irom <br />the appro�ed $38,000, to $121,150? Is that correct? (The Water Activity Summary Sheet for the Board's review is <br />almost complete) <br />Thanks for your patients. <br />Craig Godbout <br />Program Manager <br />Colorado Water Conservation Board <br />Water Supply Planning Section <br />1580 Logan Street, Suite 200 <br />Denver CO 80203 <br />(303) 866-3441, ext 3210 (office) <br />(303) 547-8061 (cell) <br />craig. godbout@ state. co. us <br />hotchlaw@aol.com <hotchlaw@aol.com> <br />To: craig.godbout@state.co.us <br />Cc: Kirk.Russell@state.co.us <br />Tue, Jan 14, 2014 at 11:39 AM <br />Thanks for your help in getting this lined out. I am attaching a copy of the amended Application that was filed <br />with the Gunnison Basin Roundtable in October, 2013, and which I thought the CWCB office was provided. It <br />does only address the request for increased Basin funding to bring the total grant up to 50% of the estimated <br />cost of the project, with out increasing the grant funding from the State fund. <br />Not much was changed or added in the amended application. I belie� the changes addressed the fact that Lone <br />Cabin was only appro�ed for a 25% grant at the September CWCB meeting and identified some additional <br />engineering expenses that were incurred in the Summer 2013. Since the Gunnison Basin Roundtable had, in <br />March approved and recommended a 100% grant for the project, it was suggested to us by John McClow, with <br />Kirk Russell indicating his agreement (following the CWCB decision at the September meeting) that we go back <br />to the Gunnison Basin Roundtable with a request to increase Basin funds and bring the grant up to 50% of the <br />estimated cost of the project. <br />! also hav�e an electronic copy of the Plans and Specifications for the project, prepared by Buckhom Geotech out <br />https://mail.g oog le.corc✓mai I/?ui=2&ilr5e5e6d73e6&Hev� pt8�q=hotchlavV%40ad.com&q s=true&search=q uery�th=143917cb919aebe8 1/4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.