My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Gunnison - Lone Cabin Ditch & Reservoir - Dam Rehabilitation_Misc Doc
CWCB
>
WSRF Grant & Loan Information
>
DayForward
>
ARK - GUNNISON
>
Gunnison - Lone Cabin Ditch & Reservoir - Dam Rehabilitation_Misc Doc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2015 3:57:35 PM
Creation date
5/13/2014 9:14:12 AM
Metadata
Fields
Template:
WSRA Grant and Loan Information
Basin Roundtable
Gunnison
Applicant
Lone Cabin Ditch & Reservoir Company
Description
Lone Cabin Dam Rehabilitation
Account Source
Basin
Board Meeting Date
1/28/2014
Contract/PO #
C150529
WSRA - Doc Type
Supporting Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2/19/2014 <br />i _:�'.'.'.-:�i <br />t <br />�}�`;�Y r.�i ���' � <br />`,,���;' • ■ r s <br />Re: Lone Cabin <br />State.co.us Executi�e Branch Mail - Re: Lone Cabin <br />Russell - DNR, Kirk <kirk.russell@state.co.us> <br />To: Jim Briscoe <hotchlaw@aol.com> <br />Cc: Craig Godbout - DNR <craig.godbout@state.co.us> <br />Yes <br />Wed, Jan 8, 2014 at 1:56 PM <br />All money has to go through the CWCB approval. The Basin Chair has to send the info to CWCB staff to get it on <br />the agenda. <br />Not sure that has been done. <br />K <br />IGrk G. Russell, P.E., Chief <br />Rnance & Administration Section <br />Cobrado Water Conservation Board <br />Department of Natural Resources <br />1580 Logan Street, Suite 600 <br />Denver, CO 80203 <br />Phone: (303) 866-3441 ext. 3232 <br />Cell: (303) 956-5653 <br />Fax: (303) 894-2578 <br />kirk.russell@state.co.us <br />www, cwcb. state. co. us <br />On Wed, Jan 8, 2014 at 1:54 PM, <hotchlaw@aol.com> wrote: <br />Do we need CWCB approval for the increased Basin funds (50%) or is Basin approval all we need? I thought it <br />would go before the CWCB in January or March for final approval. Jim <br />Briscoe & Associates, P.C. P.O. Box 120 Hotchkiss, CO 81419 970-872-3118 970-872-4518 FAXThis <br />electronic message transmission and any files transmitted with it, are a communication from the law firm of <br />Briscoe & Associates, P.C. This message contains information protected by the attorney/client privilege and is <br />confidential or otherwise the exclusiwe property of the intended recipient or Briscoe & Associates, P.C. This <br />information is solely for the use of the individual or entity that is the intended recipient. If yau are not the <br />designated recipient, or the person responsible for delivering the communication to its intended recipient, <br />please be aware that any dissemination, distribution or copying of this communication is strictly prohibited. If <br />you have receiv�ed this electronic transmission in error, please notify by telephone (970-872-3118), collect or by <br />electronic mail and promptly destroy the original transmission. Thank you for your assistance. <br />Russell - DNR, Kirk <kirk.russell@state.co.us> Wed, Jan 8, 2014 at 2:06 PM <br />To: Jim Briscoe <hotchlaw@aol.com> <br />Cc: Craig Godbout - DNR <craig.godbout@state.co.us> <br />https://mail .g oog le.corr�mai U?ui=2&i Ir 5e5e6d73e6&vi ev� pt&q =hotchlaW%40aol.corri8�q s=true&search=q uer�th=14373a52cf858c95 1/5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.