Laserfiche WebLink
`-�- ;: <br />'� r.ras'��� - - ■ <br />"'..�,��;' � � ■ ■ • <br />Re: Lone Cabin <br />Johnson,Derek - CWCB <derek.r.johnson@state.co.us> <br />To: "Russell - DNR, Kirk" <kirk.russell@state.co.us> <br />Cc: Peg Mason <peg.mason@state.co.us> <br />The board memo included a project cost table that showed : <br />engineering $103,500 <br />construction $230,800 <br />total <br />$334, 300 <br />Mon, Mar 3, 2014 at 9:22 AM <br />I've modified the document to show these values increased proportionally hit the target loan+grant <br />funding values: <br />grant $167,150 <br />loan $252,803 <br />total $419, 953 <br />These would be the new totals, increased proportionally: <br />Task 1 — Engineering $130,018 <br />Task 2 — Construction $289,935 <br />Is this the correct way to go about this? Alternatively, the engineering could be left alone, and the <br />construction amount increased. Does it matter which pot the funds are in? <br />Derek R. Johnson, P.E. <br />Water Project Loan Program <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />1580 Logan Street, Suite 600 <br />Den�er, CO 80203 <br />Phone: (303)866-3441 x 3254 <br />derek. r. johnson@state. co. us <br />www. cwc b. s tate. co. u s <br />On Thu, Feb 27, 2014 at 2:45 PM, Russell - DNR, Kirk <kirk.russell@state.co.us> wrote: <br />Jim Briscoe called and said he wants us to inflate his project costs to match the higher loan amount plus the <br />approv�ed WSRA grant. <br />Derek - can you do so and get it back to Peg? <br />I am not sure where the latest �ersion is. Peg? <br />Peg is out tomorrow (Friday). <br />IGrk C� Russe�, P.E, Chief <br />