Laserfiche WebLink
Attaeliment to AFnended Grant Application I�ar�n <br />Water Supply Reserve Account <br />Colorado Water Conservation Board <br />Gunnison �3asin Roundtable <br />ApplicaYion of Lone Cabin lliich and Reservoir Con�pany <br />Project Costs: <br />2011 <br />Septen�ber 9 JN Engineeri�ag $ 756.30 <br />October 2 Construct by-pass ditch 1574.56 <br />October 27 Scott Drilling 3439.4; <br />October 27 Buckhorn Geotech 97'9.80 <br />2012 <br />January 26 Buc),chorn Geotech 7858.26 <br />March 29 Advanced �'erra Testing �4349.00 <br />August 14 Iiuckharn Geotech 23380.77 <br />Deceznber Buckhorn Geoiecl� 280�.00 <br />December Buckhorn Geotech 3931.25 <br />TOTAL <br />July, 2013 <br />Additional Engineering <br />Total <br />� <br />February 17, 2013 <br />$49,QG9.37 <br />„ 21,878.00 <br />$70,947.37 <br />