Laserfiche WebLink
Exhibit A <br /> Statement of Work <br /> WATER ACTIVITY NAME—Lone Cabin Reservoir Rehabilitation <br /> GRANT RECIPIENT—Lone Cabin Ditch&Reservoir Company <br /> FUNDING SOURCE—WSRA Grant: $46,000 Statewide Account and $121,150 Gunnison Basin Account <br /> GENERAL DESCRIPTION OF PROJECT <br /> The Lone Cabin Dam is a 53 foot tall earthfill jurisdictional dam constructed in 1905 which has been enlarged a <br /> twice previously. It is located in Delta County and impounds 163 acre-feet (AF) of irrigation water. The <br /> Reservoir is located approximately five miles southeast of the town of Paonia at 7,380 foot elevation. The <br /> Division of Water Resources (DWR) inspected the dam on August 9, 2011 and restricted the storage by 20 feet <br /> (restricted storage capacity of 18AF) due to the safety threat of failure related to a slump found on the <br /> downstream slope of the dam embankment. The dam has been operating under this restriction since August <br /> 2011. <br /> OBJECTIVE <br /> The purpose of the project is to remove the storage restriction of Lone Cabin Reservoir and return it to its <br /> operating capacity. <br /> TASKS <br /> Task 1—Engineering <br /> This task encompasses all labor,materials,and equipment required to perform investigations,prepare plans, and <br /> secure all necessary permitting and clearances to complete the final design. <br /> Methods/Procedures: <br /> Contract and oversee the preparation of all applicable documents under the supervision of a Colorado licensed <br /> engineer or geologist as appropriate. <br /> Deliverables: <br /> Stamped and sealed approved plans, specifications, studies,and bid and construction contract documents <br /> (including engineer's opinion of probable cost)on maximum 11"x 17" sheet size. <br /> Task 2—Construction <br /> This task encompasses all labor, materials, and equipment required for the rehabilitation of the Lone Cabin <br /> Dam. This task includes all work required to install a chimney drain such as excavation of the slumped area, and <br /> placement of filter material to drain to a new toe drain. <br /> Methods/Procedures: <br /> The Lone Cabin Ditch & Reservoir Company will solicit proposals and enter into a construction services <br /> contract with a qualified contractor for construction of the dam repair improvements as recommended by the <br /> engineer. <br /> Page 1 of 3 <br />