My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150361 Contract
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
C150361 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 3:07:35 PM
Creation date
5/13/2014 9:14:06 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-059
C150361
Contractor Name
Lone Cabin Ditch and Reservoir Company
Contract Type
Loan
Water District
40
County
Delta
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PROJECT SUMMARY — Lone Cabin Ditch & Reservoir Company <br /> Contract No. C150361 <br /> SECTION 1 —BORROWER INFORMATION <br /> Name: Lone Cabin Ditch & Reservoir Company, a Colorado <br /> nonprofit corporation <br /> Address: 42384 Lamborn Mesa Road, Paonia, Colorado 81428 <br /> Contact: James Briscoe, Attorney <br /> Phone Number: 970-872-3118 <br /> E-mail address: jrb112943 @aol.com <br /> Type of Entity: Colorado nonprofit corporation <br /> SECTION 2—PROJECT DESCRIPTION <br /> A. Description of PROJECT: The BORROWER applied for a CWCB loan to be used for <br /> the repair of the Lone Cabin Dam, located in Delta County and removal of the fill <br /> restriction placed on the dam by the State Engineers Office and hereinafter referred <br /> to as the PROJECT. The repair will include the excavation of the slumped area and <br /> placement of filter material to drain to a new toe drain. <br /> B. Description of Feasibility Study: The CWCB has reviewed a feasibility study report <br /> dated May 16, 2013 on the PROJECT, titled "Geotechnical and Design Report- Lone <br /> Cabin Dam Rehabilitation,"which was prepared by James Briscoe and includes <br /> preliminary engineering design and construction cost estimates prepared by <br /> Norman J. Aufderheide, P.E., Buckhorn Geotech, Inc. and is incorporated herein by <br /> reference. Based upon the feasibility report, the CWCB determined the PROJECT to <br /> be technically and financially feasible. <br /> SECTION 3—CWCB's AUTHORITY <br /> Construction Fund: This loan is made pursuant to the provisions of§§ 37-60-119 and <br /> 37-60-120, C.R.S., which authorize the CWCB to loan money for water projects from <br /> the CWCB Construction Fund for the benefit of the people of the state, provided that <br /> the borrower assures repayment of that money. <br /> Section 37-60-122(1)(b), C.R.S., authorizes the CWCB to make loans of up to <br /> $10,000,000 from the CWCB's Construction Fund and the Severance Tax Perpetual <br /> Base Fund without prior approval from the General Assembly. <br /> SECTION 4-BOARD APPROVAL <br /> At its September 2013 meeting, the CWCB approved a Small Project Loan from the <br /> Construction Fund to the BORROWER in an amount up to $250,300 for PROJECT costs <br /> with $2,503 for the loan origination fee of 1% of the cost of the PROJECT, in accordance <br /> with CWCB Policy No. 16, resulting in a total loan amount of $252,803 at an interest <br /> rate of 1.75% per annum for a repayment term of 30 years. <br /> Appendix 1 to Loan Contract C150361 <br /> Page 1 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.