PROJECT WATER DELIVERIES ABOVE AVERAGE <br />Project water deliveries during October were 214 percent of average. <br />Colorado -Big Thompson seasonal deliveries (November 2008 - October <br />2009) were 92 percent of average to date. <br />Unit-, = 7.000 AF <br />Project <br />Delivery Point <br />Oct. <br />Delivery * <br />Seasonal Delivery <br />% of <br />Through Oct. <br />31* <br />2009 <br />Avg 1/ <br />Avg <br />2009 Avg 1/ % <br />of Avg <br />Carter Lake <br />12.0 <br />4.6 <br />261 <br />73.4 70.2 <br />105 <br />Hansen F.C.* <br />5.8 <br />5.2 <br />112 <br />33.3 52.0 <br />64 <br />Horsetooth Res.* <br />18.4 <br />7.1 <br />259 <br />95.4 97.7 <br />98 <br />CBT Total <br />36.2 <br />16.9 <br />214 <br />202.1 219.9 <br />92 <br />1/ 30 year average, 1971 -2000 <br />* Includes Windy Gap and /or Carriage Contract Water. <br />!! <br />