My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Second Draft Hermosa Creek Workgroup Final Report November 2 2009
CWCB
>
Water Supply Protection
>
DayForward
>
7001-8000
>
Second Draft Hermosa Creek Workgroup Final Report November 2 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2014 3:43:58 PM
Creation date
4/28/2014 2:26:44 PM
Metadata
Fields
Template:
Water Supply Protection
State
CO
Basin
San Juan/Dolores
Water Division
7
Date
11/2/2009
Author
River Protection Workgroup
Title
Second Draft Hermosa Creek Workgroup Final Report November 2 2009
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Definition of Consensus.. <br />Photo: Trails 2000, Mary Monroe <br />• Includes steps so that all views are heard and considered <br />• Recognizes that differences of opinion are natural /expected <br />• Group makes a good faith effort to reach a decision that everyone can support <br />Consensus does not mean everyone agrees with the decision but... they can support it <br />Ground Rules.. <br />• Respect <br />• One person talks at a time <br />• Every person's opinion is important <br />• Determine truth and facts based on solid data <br />• Speak up and raise issues for discussion P17ete -T <br />Prior to the HCW kicking off, the RPW devised a process model which was agreed to by <br />the HCW. This phased approach to the discussions is described as follows: <br />Phase I: <br />Background information will be shared. The group process will be fully discussed and <br />agreed upon. <br />Phase II: <br />Hermosa Creek values will be discussed, including natural, social, cultural and /or <br />economic values, addressing any protections already in place. By the end of Phase II, <br />participants will have considered a range of options for protecting important values on <br />Hermosa Creek. No decisions will be made in this phase. <br />Hermosa Creek Workgroup Final Report: Second Draft 11/2/09 F;FSt D aft: '^�9 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.