Laserfiche WebLink
Project Summary - McDonald Ditch Company - Contract No. C150334 <br /> SECTION 1 —BORROWER INFORMATION <br /> Name: McDonald Ditch Company, a mutual ditch company <br /> Address: 2483 U.S. Highway 285 North, Monte Vista, CO 81144 <br /> Contact: James Hart, President <br /> Phone Number: 719-852-3246 <br /> E-mail address: James @hartfarmsinc.com <br /> Type of Entity: Mutual ditch company <br /> Section 2 — Project Description <br /> A. Description of PROJECT: The BORROWER applied to the CWCB for a loan, in May <br /> 2012, to be used for the construction of the McDonald Ditch Diversion and <br /> Headgate Replacement Project, located in Rio Grande County, hereinafter <br /> referred to as the PROJECT. The purpose of this PROJECT is to replace the existing <br /> McDonald Ditch diversion dam, headgate structure and pipeline. Due to a change in <br /> the final engineering design of the head gate and diversion structure, the total cost <br /> of the PROJECT increased from $650,000 to $1,085,200. In September 2013, the <br /> CWCB approved a loan increase of $30,000, from $70,000 to 100,000 for <br /> additional PROJECT costs. <br /> B. Description of Feasibility Study: The CWCB has reviewed a feasibility study report <br /> on the PROJECT entitled "Plaza Project-Phase II: McDonald Ditch Implementation <br /> Project," dated March 22, 2012, compiled by Heather Dutton, Coordinator, Rio <br /> Grande Headwaters Restoration Project and Laurie Clark, P.E., Natural Resources <br /> Conservation Service. An additional analysis, by the Colorado Rio Grande <br /> Restoration Foundation, was completed on August 1, 2013. These documents are <br /> incorporated herein by reference and based upon these reports, the CWCB <br /> determined the PROJECT to be technically and financially feasible. <br /> SECTION 3—CWCB's AUTHORITY <br /> Construction Fund: This loan is made pursuant to the provisions of§§ 37-60-119 and <br /> 37-60-120, C.R.S., which authorize the CWCB to loan money for water projects from <br /> the CWCB Construction Fund for the benefit of the people of the state, provided that <br /> the borrower assures repayment of that money. <br /> Section 37-60-122(1)(b) C.R.S., authorizes the CWCB to make loans of up to <br /> $10,000,000 from the CWCB's Construction Fund without prior approval from the <br /> General Assembly. <br /> SECTION 4-BOARD APPROVAL <br /> On May 15, 2012, the CWCB approved a Small Project Loan from the Construction <br /> Fund, to the BORROWER, in an amount up to $70,000 for PROJECT costs for the <br /> McDonald Ditch Diversion and Headgate Replacement Project. On September 25, <br /> 2013, the CWCB approved a loan increase of $30,000, from $70,000 to 100,000 for <br /> additional PROJECT costs with a loan origination fee of 1% of the cost of the PROJECT, in <br /> • <br /> Appendix 1 to Loan Contract C150334 <br /> Page 1 of 4 <br />