Laserfiche WebLink
' 1 i <br /> lob <br /> r y <br /> CONSULTANTS.INC. <br /> ®css <br /> GUSTAV GEORGE SLOVENSKY, P.E. <br /> HYDRAULIC ENGINEER <br /> BACKGROUND <br /> Mr. Slovensky specializes in water resources engineering and <br /> has 20 years of consulting experience working on a wide <br /> variety of water resources related projects. His experience <br /> includes hydrologic and hydraulic modeling, flood hydrology <br /> studies, floodplain mapping and FEMA submittals, stream <br /> stabilization and restoration, water resources planning <br /> studies, and the design of hydraulic structures . He has <br /> managed small and large projects with design fees up to 1 . 3 <br /> million. <br /> EDUCATION <br /> B.S. , Civil Engineering, University of Florida, Gainesville, <br /> FL 1981 <br /> M.S. Civil Engineering (Hydraulics) , Colorado State <br /> University, Ft. Collins, CO 1993 <br /> PROFESSIONAL REGISTRATION <br /> Registered Professional Engineer: Colorado <br /> RELEVANT EXPERIENCE <br /> Floodplain Mapping <br /> Sanderson Gulch- CLOMR. Project Manager; CLOMR for three new <br /> grade control structures. <br /> • Monument Creek LOMR. Project Manager; LOMR submittal for <br /> approximately 1 mile reach of Monument Creek above Woodmen <br /> Road. <br /> Sand Creek CLOMR. Project Manager; CLOMR for a new grade <br /> control structure. <br /> Fountain Creek Floodplain Restudy. Project Manager; Restudy <br /> of the floodplain for a 4 . 9 mile reach of Fountain Creek . <br /> Jordan River Revised Flood Insurance Study. Project Engineer; <br /> FEMA FIS restudy for 9. 6 miles of the Jordan River in Utah. <br /> City of Avon Lake Revised Flood Insurance Study. Project <br /> Engineer; Revisions to flood insurance maps carried out for <br /> three city drainages . <br />