Laserfiche WebLink
KOREY J. KADRMAS, P.E. <br /> PAGE 2 <br /> GRASS VALLEY RESERVOIR DAM, BREACH INUNDATION EVALUATION, EAGLE COUNTY, <br /> COLORADO, FOR SILT WATER CONSERVANCY DISTRICT. Project Manager for the <br /> development of simulated dam breach analyses and a Breach <br /> Inundation Report. Failure of Grass Valley Reservoir Dam will <br /> result in inundation of significant portions of the town of <br /> Silt, CO and overtopping of U.S. Interstate 70. <br /> Responsibilities included development of the simulated dam <br /> breach parameters and dam breach hydrograph; development of <br /> HEC-HMS and HEC-RAS models for the hydraulic analysis of a <br /> downstream channel and the Colorado River; and preparation of <br /> the inundation maps and Breach Analysis Report. <br /> ALSBURY DAM, MESA COUNTY,COLORADO, FOR BASEPOINT DESIGN CORPORATION. <br /> Project Manager for performance of hydraulic and hydrologic <br /> analyses to support preparation of an updated Hazard <br /> Classification Report, Hydrology Report, and a spillway <br /> rehabilitation alternatives study. <br /> JERRY CREEK RESERVOIR No.2 ENLARGEMENT, MESA COUNTY, COLORADO, FOR UTE <br /> WATER CONSERVANCY DISTRICT. Project Manager responsible for <br /> development of Emergency Action Plans for three dams <br /> comprising the Jerry Creek Reservoir system. Work included dam <br /> breach modeling and inundation mapping. <br /> CABRESTO DAM REHABILITATION,TAOS COUNTY, NEW MEXICO, FOR NEW MEXICO <br /> OFFICE OF THE STATE ENGINEER. Project Engineer and Lead Hydraulic <br /> Engineer responsible for conceptual design of modifications to <br /> the Cabresto Dam embankment and spillway and preparation of <br /> dam breach analysis and Emergency Action Plan. Work included <br /> development of simulated dam breach parameters, dam breach <br /> hydrographs; development of HEC-HMS and HEC-RAS models for the <br /> hydraulic analysis of downstream river reaches; breach <br /> inundation maps; Breach Analysis Report; and Emergency Action <br /> Plan. <br /> NOECKER RESERVOIR DAM, DAM BREACH AND INUNDATION ANALYSIS, EAGLE COUNTY, <br /> COLORADO, FOR GRAND RIVER CONSULTING. Project Manager for the <br /> development of simulated dam breach analyses and a Breach <br /> Inundation Report. Failure of Noecker Reservoir Dam will <br /> result in inundation of significant portions of the town of <br /> Eagle, CO and overtopping of U. S. Interstate-70. <br /> Responsibilities included overall project management and <br /> coordination of work performed, and leading hydraulic and <br /> hydrologic analyses for the development of the simulated dam <br /> breach parameters and dam breach hydrograph; development of a <br /> LR <br /> xTauts,wC. <br />