Laserfiche WebLink
SECTION 4-BOARD APPROVAL AND LEGISLATIVE AUTHORIZATION (IF NEEDED) <br /> At its July 17, 2013 meeting, the CWCB approved a Small Project Loan from the <br /> Construction Fund to the BORROWER in an amount up to $167,500 for PROJECT costs, <br /> with $1,675 for the loan origination fee of 1% in accordance with CWCB Policy No. 16, <br /> resulting in a total loan amount of $169,175 at an interest rate of 3.0% per annum for <br /> a repayment term of 30 years. A contract was not executed at that time. On March 19, <br /> 2014, CWCB approved a change to the loan contract that included changing the <br /> BORROWER from Bellyache Ridge Metropolitan District to the Bellyache Ridge <br /> Metropolitan District acting by and through its Bellyache Ridge Water Enterprise and a <br /> change of pledged collateral from mill levy revenues and annual financial reporting to <br /> user fees and rates and annual financial reporting. <br /> SECTION 5—SCHEDULE OF EXISTING DEBT <br /> No other debt, backed by user fees and rates, exists. <br /> SECTION 6—ADDITIONAL CONDITIONS& CONTRACT REQUIREMENTS <br /> NONE <br /> SECTION 7—CONSTRUCTION FUND PROGRAM PROCEDURES <br /> A. The BORROWER shall employ an engineer, registered in the state of Colorado to <br /> prepare plans and specifications for the PROJECT. <br /> B. Engineering contracts, plans and specifications must be submitted to the CWCB <br /> staff for verification of compliance with the terms of this CONTRACT when available <br /> prior to bidding. Any modifications to the plans and specifications must be <br /> approved in writing by the CWCB staff. <br /> C. For plans and specifications for all jurisdictional dams and reservoirs, as defined <br /> by § 37-87-105 C.R.S., the BORROWER shall provide a letter of approval from the <br /> State Engineer's Office prior to construction. <br /> D. The BORROWER shall extend an invitation to CWCB to be present at the bid <br /> opening. <br /> E. The BORROWER shall contract for the construction of the work with responsible and <br /> capable Construction Firms, which said Construction Firms shall be selected by <br /> the BORROWER and found acceptable by the CWCB staff. <br /> F. The BORROWER must provide a copy of the executed construction contract <br /> documents consisting of the contractor's proposal, construction contract, <br /> performance bond, payment bond, notice of award, notice to proceed, sample <br /> change order, and sample field order, as well as the advertisement for bid and bid <br /> bond at bidding. After the CWCB staff verifies that these documents comply with <br /> the terms of this CONTRACT, the BORROWER may issue the notice to proceed to the <br /> Construction Firms. <br /> Appendix 1 to Loan Contract C150356 <br /> Page 2 of 4 <br />