Laserfiche WebLink
F. Actual construction as called for in the design documents and in change orders <br /> approved by the CWCB and the BORROWER. <br /> G. Engineering services for construction management, including design and <br /> construction management for CWCB-approved change orders. <br /> H. Interest during completion of the PROJECT pursuant to Paragraph A.4 of the <br /> CONTRACT. <br /> I. Legal services for reviewing engineering services contracts, reviewing this <br /> CONTRACT, reviewing construction contract documents, and for complying with all <br /> federal, state, and local regulatory requirements. <br /> SECTION 9—DISBURSEMENT SCHEDULE <br /> For PROJECT costs: The BORROWER shall prepare a periodic progress report which <br /> contains a statement of the PROJECT costs expended for that period and shall <br /> forward said statement to the CWCB. After receipt of the periodic progress report <br /> from the BORROWER, and review and acceptance of the items therein as eligible <br /> expenses as described below, the CWCB will pay to the BORROWER the amount <br /> set forth in the report or such portion that has been approved by the CWCB. Such <br /> payment shall be made within thirty (30) days from the CWCB's approval of each <br /> progress report. <br /> SECTION 10—TIME FOR PERFORMANCE <br /> PROJECT Beginning: Upon EFFECTIVE DATE of this CONTRACT (the date this <br /> CONTRACT is signed by the State Controller or his designee). <br /> PROJECT Finish: Three (3) years from the EFFECTIVE DATE of this CONTRACT. <br /> • <br /> Appendix 1 to Loan Contract C150366 <br /> Page 4 of 4 <br />