Laserfiche WebLink
SECTION 4-BOARD APPROVAL AND LEGISLATIVE AUTHORIZATION <br /> At its September 2013 meeting, the CWCB approved a Small Project Loan from the <br /> Construction Fund to the BORROWER, in an amount up to $4,500,000 for PROJECT costs, <br /> with $45,000 for the loan origination fee of 1% in accordance with CWCB Policy No. 16, <br /> resulting in a total loan amount of$4,545,000 at an interest rate of 2.75% per annum for a <br /> repayment term of 20 years. <br /> SECTION 5—SCHEDULE OF EXISTING DEBT <br /> No other debt, backed by the Water Utility Enterprise revenues, exists. <br /> SECTION 6—ADDITIONAL CONDITIONS &CONTRACT REQUIREMENTS <br /> NONE <br /> SECTION 7—CONSTRUCTION FUND PROGRAM PROCEDURES <br /> A. The BORROWER must submit a written appraisal or opinion of value from a <br /> qualified water rights appraiser supporting the purchase price prior to disbursal of <br /> loan funds. <br /> B. The BORROWER shall pay all of the expenses related to the PROJECT when such <br /> bills are due. <br /> AND <br /> A. The BORROWER shall employ an engineer, registered in the state of Colorado to <br /> prepare plans and specifications for the PROJECT. <br /> B. Engineering contracts, plans and specifications must be submitted to the CWCB <br /> staff for verification of compliance with the terms of this CONTRACT when available <br /> prior to bidding. Any modifications to the plans and specifications must be <br /> approved in writing by the CWCB staff. <br /> C. For plans and specifications for all jurisdictional dams and reservoirs, as defined <br /> by § 37-87-105 C.R.S., the BORROWER shall provide a letter of approval from the <br /> State Engineer's Office prior to construction. <br /> D. The BORROWER shall extend an invitation to CWCB to be present at the bid <br /> opening. <br /> E. The BORROWER shall contract for the construction of the work with responsible and <br /> capable Construction Firms, which said Construction Firms shall be selected by <br /> the BORROWER and found acceptable by the CWCB staff. <br /> F. The BORROWER must provide a copy of the executed construction contract <br /> documents consisting of the contractor's proposal, construction contract, <br /> performance bond, payment bond, notice of award, notice to proceed, sample <br /> change order, and sample field order, as well as the advertisement for bid and bid <br /> Appendix 1 to Loan Contract C150366 <br /> Page 2 of 4 <br />