My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10825 Water Supply Alternative Summary Phase 2 Assessment January 2008 Draft
CWCB
>
Water Supply Protection
>
DayForward
>
7001-8000
>
10825 Water Supply Alternative Summary Phase 2 Assessment January 2008 Draft
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2017 11:22:03 AM
Creation date
4/14/2014 1:20:25 PM
Metadata
Fields
Template:
Water Supply Protection
Description
A report from the Grand River Consulting Corporation on alternatives for delivering 10,825 AF of water to the 15-mile reach of the Colorado River.
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
1/1/2008
Author
Grand River Consulting Corporation
Title
10825 Water Supply Alternative Summary Phase 2 Assessment January 2008 Draft
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3.0 ELEMENTS SCREENED FROM FURTHER STUDY <br />Based upon study objectives, and upon the evaluation criteria, 17 facilities were screened from <br />further investigation. The facilities screened from further study are listed below. Please note <br />that two of these screened facilities (Roan Creek Reservoir and Wolcott Reservoir) were <br />eliminated from further study because it is not likely that either project is capable of being <br />agreed upon and supported by the Water Providers and other project participants by December <br />20, 2009. If developed in the future, either of these facilities may become viable sources of <br />10825 Water. <br />Prior to elimination from further consideration, conceptual -level designs and updated cost <br />estimates were provided by GEI Consultants. This information was used to evaluate the 15 Mile <br />Reach Pump back, Yank Creek Reservoir, Roan Creek Reservoir and Wolcott Reservoir in addition <br />to the other facilities carried forward in the study. Detailed hydrology, aquatic impacts, <br />environmental and permitting evaluations were not conducted for these screened out <br />alternatives. <br />Facility <br />• 15 Mile Reach Pump back <br />• Mt. Logan Reservoir <br />• Yank Creek Reservoir <br />• Pipeline from Ruedi to Basalt <br />• Pipeline /Tunnel Ruedi to Roaring Fork <br />• Webster Hill Reservoir <br />• Grand Valley Lake <br />• Middle Fork Reservoir <br />• Roan Creek Reservoir <br />• Wolcott Reservoir <br />• Shoshone Call Subordination <br />• Upper Colorado Reservoirs (6) <br />Evaluation Criteria Not Met <br />Water Quality <br />Engineering Feasibility <br />Minimum yield, engineering <br />Cost, permitting <br />Cost, permitting, engineering <br />Schedule, target species, permitting <br />Schedule, water quality, permitting <br />Minimum yield <br />Schedule <br />Schedule <br />Yield, stakeholder consensus <br />Minimum yield <br />10825 VV3t0T'SUJ)P1y StUdy Phise 2 Alternatives Assessment January 2008 Draft. 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.