My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10825 Water Supply Alternative Summary Phase 2 Assessment January 2008 Draft
CWCB
>
Water Supply Protection
>
DayForward
>
7001-8000
>
10825 Water Supply Alternative Summary Phase 2 Assessment January 2008 Draft
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2017 11:22:03 AM
Creation date
4/14/2014 1:20:25 PM
Metadata
Fields
Template:
Water Supply Protection
Description
A report from the Grand River Consulting Corporation on alternatives for delivering 10,825 AF of water to the 15-mile reach of the Colorado River.
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
1/1/2008
Author
Grand River Consulting Corporation
Title
10825 Water Supply Alternative Summary Phase 2 Assessment January 2008 Draft
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Phase 1 of the alternatives assessment was a "preliminary screening" evaluation. A total of 15 <br />potential 10825 facilities or alternatives that were identified in early 2007 were evaluated and <br />compared at a reconnaissance level. After consideration of the Phase 1 study results, five of the <br />initial concepts were determined by the 10825 Steering Committee to not warrant further study <br />or consideration in the Phase 2 assessment. <br />This study provides information regarding the viability, environmental impacts, issues, and costs <br />of potential 10825 Water supply alternatives and facilities. The specific facilities recommended <br />for further analysis in the Phase 1 study have been assessed. Also, at the direction of the 10825 <br />Steering Committee, additional elements and combinations of facilities that had not been <br />considered in Phase 1 were added to the Phase 2 scope of study. In total, more than 20 <br />alternatives, facilities (including structural and non - structural components), and combinations of <br />facilities have been evaluated in this study. The location of each 10825 facility that has been <br />evaluated is identified on the vicinity map in the front of this summary report. <br />Information from the Phase 2 Assessment is intended to facilitate the selection of a preferred <br />alternative or group of alternatives that can be supported by both West Slope and East Slope <br />water providers. A website with project notes, technical memoranda, engineering reports, and <br />environmental reports that have been prepared by the study team is available at <br />www.grandriver.us /10825. Background material on the Recovery Program and an extensive file <br />reference library with material related to specific facilities is available to all interested parties via <br />this project website. <br />1.2 OBJECTIVES FOR 10825 WATER SUPPLY ALTERNATIVES <br />The primary objectives of each 10825 Water supply alternatives are to: <br />• Permanently supply 10,825 acre feet of water during the late summer <br />and fall months in all years, including dry years <br />• Not impair or reduce the water supply available to any West Slope or <br />East Slope Water provider <br />Secondary considerations in the study included developing alternatives that would benefit <br />and /or have minor negative impacts on the headwater streams in the Colorado River Basin. <br />Some of the alternatives outlined in this report meet this secondary objective better than <br />others. <br />A key component of the 10825 Water Supply Study process was that the preferred alternatives <br />must be supported by the stakeholders in the study process. The most promising alternatives <br />that meet BOTH the primary objectives AND the secondary considerations are most likely to <br />have support by the stakeholders in this process. <br />10325 WatK Supply Study Phase 2 Alternativos Assessment January 2008 Draft 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.