My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10825 Water Supply Alternative Summary Phase 2 Assessment January 2008 Draft
CWCB
>
Water Supply Protection
>
DayForward
>
7001-8000
>
10825 Water Supply Alternative Summary Phase 2 Assessment January 2008 Draft
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2017 11:22:03 AM
Creation date
4/14/2014 1:20:25 PM
Metadata
Fields
Template:
Water Supply Protection
Description
A report from the Grand River Consulting Corporation on alternatives for delivering 10,825 AF of water to the 15-mile reach of the Colorado River.
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
1/1/2008
Author
Grand River Consulting Corporation
Title
10825 Water Supply Alternative Summary Phase 2 Assessment January 2008 Draft
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TABLE OF CONTENTS <br />1.0 Background <br />1.1 Study Process <br />1.2 Objectives for 10825 Water Supply Alternatives <br />1.3 Purpose and Need Statement <br />2.0 Evaluation Criteria <br />3.0 Elements Screened from Further Study <br />4.0 Recovery Program Water Release Principles <br />4.1 Study Years <br />4.2 Release Schedules <br />5.0 Alternatives Studied in Detail <br />6.0 General Observations "A to Z" <br />6.1 Benefit to the Endangered Fish Recovery Program <br />6.2 Timing of 10825 Releases <br />6.3 Colorado River - Headwater Impacts <br />6.4 Fryingpan River / Ruedi Reservoir <br />6.5 Orchard Mesa Irrigation District Improvements <br />6.6 Sulphur Gulch Reservoir <br />6.7 Water Quality <br />6.8 Concluding Observations <br />7.0 Paired Alternatives Not Recommended for Further Consideration <br />7.1 Ruedi Reservoir paired with Buzzard Creek Reservoir <br />7.2 Ruedi Reservoir paired with Williams Fork Reservoir <br />7.3 Sulphur Gulch paired with Williams Fork Reservoir <br />7.4 Wolford Mountain Reservoir & Pumpback paired with Ruedi Reservoir <br />7.5 Wolford Mountain Reservoir Pump Station paired with Buzzard Creek <br />8.0 Most Promising Alternatives <br />8.1 Ruedi Reservoir <br />8.2 Sulphur Gulch Reservoir <br />8.3 Sulphur Gulch Reservoir paired with Ruedi Reservoir <br />8.4 Lake Granby paired with Ruedi Reservoir <br />8.5 Lake Granby, Ruedi Reservoir, and OMID Improvements <br />8.6 Lake Granby paired with Sulphur Gulch Reservoir <br />9.0 Recommendations <br />Tables and Figures <br />Figure 1 Vicinity Map <br />Figure 2 15 Mile Reach Stream Flow <br />Table 1 USFWS Late Summer Flow Recommendations for 15 Mile Reach <br />Table 2 Recovery Program Water Sources <br />Table 3 10825 Water Supply Alternatives Studied in Detail <br />Table 4 Evaluation Criteria Matrix <br />Table 5 Cost Estimate Matrix <br />1 <br />1 <br />2 <br />3 <br />3 <br />4 <br />5 <br />5 <br />5 <br />7 <br />8 <br />8 <br />9 <br />9 <br />10 <br />11 <br />11 <br />12 <br />12 <br />13 <br />13 <br />13 <br />14 <br />14 <br />15 <br />16 <br />16 <br />17 <br />17 <br />18 <br />19 <br />20 <br />21 <br />i <br />6 <br />5 <br />6 <br />7 <br />22 <br />23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.