My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10825 Water Supply Alternative Summary Phase 2 Assessment January 2008 Draft
CWCB
>
Water Supply Protection
>
DayForward
>
7001-8000
>
10825 Water Supply Alternative Summary Phase 2 Assessment January 2008 Draft
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2017 11:22:03 AM
Creation date
4/14/2014 1:20:25 PM
Metadata
Fields
Template:
Water Supply Protection
Description
A report from the Grand River Consulting Corporation on alternatives for delivering 10,825 AF of water to the 15-mile reach of the Colorado River.
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
1/1/2008
Author
Grand River Consulting Corporation
Title
10825 Water Supply Alternative Summary Phase 2 Assessment January 2008 Draft
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.0 PAIRED ALTERNATIVES NOT RECOMMENDED <br />FOR FURTHER CONSIDERATION <br />An application of the evaluation criteria to all of the alternatives that have been studied in <br />detailed is presented in Table 4 at the end of this summary. Alternative cost estimates are <br />summarized in Table 5. Please note that cost was not a determining factor in identifying those <br />alternatives not recommended for further consideration. Economic assumptions associated <br />with each of the individual facilities are described in the memo, Unit Cost Estimates 10825 <br />Water Supply Alternatives, which is available on the project website. <br />After significant detailed review and analysis, the following five alternatives are not <br />recommended for further consideration, as illustrated on Table 4. <br />• Ruedi Reservoir paired with Buzzard Creek Reservoir (C2) <br />• Ruedi Reservoir paired with Williams Fork Reservoir (0) <br />• Sulphur Gulch Reservoir paired with Williams Fork (C4) <br />• Wolford Mnt. Reservoir Expansion & Pump paired with Ruedi Reservoir (C5) <br />• Wolford Mnt. Reservoir Pump paired with Buzzard Creek Reservoir (C6) <br />Each of these five alternatives is described in more detail in memoranda that are available on <br />the project website. A brief description and evaluation of each of the alternatives not <br />recommended for additional consideration is presented below. <br />7.1 RUEDI RESERVOIR PAIRED WITH BUZZARD CREEK RESERVOIR (Alternative C2) <br />This alternative provides 5,412 acre -feet of water from Ruedi Reservoir with 5,412 acre -feet of <br />water from Buzzard Creek Reservoir in each and every year. This alternative is not <br />recommended for further consideration primarily due to the more significant wetland impacts <br />of Buzzard Creek Reservoir when compared to other structural alternatives. This element would <br />likely not be the Least Environmentally Damaging Practicable Alternative (LEDPA) when <br />compared to other alternatives. <br />7.2 RUEDI RESERVOIR PAIRED WITH WILLIAMS FORK RESERVOIR (Alternative C3) <br />This alternative would provide different amounts of water from Ruedi and Williams Fork <br />Reservoirs from year to year, depending upon whether it was a drier than average or wetter <br />than average year. In above average and wet years, 2,700 acre feet of water would be released <br />from Williams Fork Reservoir and 8,125 acre feet of water would be released from Ruedi <br />Reservoir. In dry and below average years, all 10825 Water would be supplied from Ruedi <br />10825 Water Supply Study Phase 2 Alternatives Assessment January 2008 Graft 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.