My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10825 Water Supply Alternative Summary Phase 2 Assessment January 2008 Draft
CWCB
>
Water Supply Protection
>
DayForward
>
7001-8000
>
10825 Water Supply Alternative Summary Phase 2 Assessment January 2008 Draft
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2017 11:22:03 AM
Creation date
4/14/2014 1:20:25 PM
Metadata
Fields
Template:
Water Supply Protection
Description
A report from the Grand River Consulting Corporation on alternatives for delivering 10,825 AF of water to the 15-mile reach of the Colorado River.
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
1/1/2008
Author
Grand River Consulting Corporation
Title
10825 Water Supply Alternative Summary Phase 2 Assessment January 2008 Draft
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Table 2 <br />Recovery Program Water Sources <br />Figure 2 <br />Grn Mtn <br />Wolford <br />Study <br />10825 <br />Ruedi 5 + <br />HUP <br />Mtn Fish <br />■ Wolford 6K Pool <br />Year <br />Year <br />Water <br />5 Water <br />Surplus <br />Pool <br />Total <br />Dry <br />1977 <br />10,825 AF <br />5,000 AF <br />0 AF <br />6,000 AF <br />21,825 AF <br />Below Average <br />1988 <br />10,825 AF <br />10,000 AF <br />15,000 AF <br />6,000 AF <br />41,825 AF <br />Above Average <br />1982 <br />10,825 AF <br />10,000 AF <br />30,000 AF <br />0 AF <br />50,825 AF <br />Wet <br />1983 <br />1 10,825 AF <br />10,000 AF <br />45,000 AF <br />0 AF <br />65,825 AF <br />In coordination with the USFWS, we have developed potential release schedules for each of the <br />four study years. These release schedules are for the July through October period, and are <br />based on the basic operational principles described in the memo Release Schedules for 10825 <br />Alternatives, which is available on the project website. The operating /release principles are for <br />use in this study only, and are based upon the experience and professional judgment of the <br />USFWS and others. <br />The release schedule for the below average study year of 1988 is illustrated below. The release <br />schedules used in this study are not binding, nor are they formalized in any specific agreement. <br />(See related memo for other study years.) Please note that these release patterns benefit from <br />hindsight, and that actual Recovery Program releases in the future may or may not occur in a <br />manner consistent with the simulations and assumptions used in this study. <br />10,825 Venter Supply Study Phase ? Alternatives Assessment January 2008 Draft 6 <br />Figure 2 <br />15 Mile Reach Streamflow (Below Avg 1988) <br />2000 <br />O 15 Mile Target 1,240 cfs <br />■ Wolford 6K Pool <br />1800 <br />O Grn Mtn HUP Surplus <br />1600 <br />❑ Ruedi 5K + 5K <br />1400 <br />®10825 Water <br />0 Future Discharge w/o Fish Water (cfs) <br />1200 <br />1000 <br />800 <br />600 <br />400 <br />200 <br />0 <br />7�4/ <br />is 2y 12949 26q`9 9sPp 2�?sep Oct )Oct <br />✓4/ ✓4/ <br />10,825 Venter Supply Study Phase ? Alternatives Assessment January 2008 Draft 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.