Laserfiche WebLink
�T,Fr <br />Y <br />Arkansas Basin Roundtable Technical Meeting #2 <br />January 71 2004 <br />BRT Technical Meetini: 2:00 p.m. to 5:00 p.m. <br />■ Welcome and Introductions 2:00 - 2:10 <br />■ Overview of SWSI Process and Status (CWCB /CDM) 2:10 - 2:20 <br />Water Management Objectives (CDM) 2:20 - 2.50 <br />o Review of revised objectives and subobjectives <br />o Weighting methodology and weighting "homework" <br />Preliminary Water Demand Estimates 2 :50 - 3:30 <br />o Review of methodology <br />o Preliminary results <br />o Activities to finalize <br />o * * *10- minute break at approximately 3:30 * ** <br />■ Overview of Water Supply Methodology (CDM) 3:40 - 4:00 <br />o Supply information in -hand <br />o Methodology, constraints, and next steps <br />• Preliminary List of Options and Tiering 4:00 - 4 :55 <br />o Preliminary list of options <br />o Review of tiering, use in alternatives, and alternatives evaluation <br />o Next steps <br />• Summary of Afternoon Session (Facilitator) 4 :55 -5:00 <br />Dinner Break: 5:00 p.m. to 6:30 p.m. <br />Additional Discussion and Stakeholder Comment: 6:30 p.m. to 8:00 p.m. <br />■ Brief Summary of Afternoon Session (Facilitator) <br />■ Additional Roundtable Discussion on Afternoon Items (if needed) <br />■ Stakeholder Comment <br />■ Preparation for BRT Meeting 2 (Facilitator) <br />cm <br />C:\Documents and Settings\rehringjp \DesktopWrk BRT Meeting 2 Agenda.doc 12/17/2003 <br />6:30 - 6:35 <br />6:35 - 7:00 <br />7.00-7:45 <br />C1' 8iff -Tlh7 <br />