My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04SA44 Amici Curiae Brief
CWCB
>
Water Supply Protection
>
DayForward
>
7001-8000
>
04SA44 Amici Curiae Brief
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2015 10:33:01 AM
Creation date
4/10/2014 12:02:31 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Amici Curaie brief from the Rio Grande Water Conservation District in support of CWCB in the Upper Gunnison River Water Conservancy District's RICD Case No. 02CW038.
State
CO
Basin
Gunnison
Water Division
4
Date
7/26/2004
Author
Rio Grande Water Conservancy District
Title
04SA44 Amici Curiae Brief
Water Supply Pro - Doc Type
Court Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Water Board provides the sole source of municipal water supply to over a million people. In <br />order to maintain the high level of quality and dependability that the Water Board's customers <br />deserve, the Water Board needs certainty as well as flexibility in the operation of its system. The <br />Water Board operates numerous exchanges throughout its system and makes new appropriations <br />of water depending upon the circumstance. Proliferation of recreational water rights that <br />command the entire flow of a river could seriously impede the Water Board's ability to operate <br />exchanges and appropriate water to keep up with the growing municipal demand. <br />4. Southeastern Colorado Water Conservancy District ( "Southeastern") is a statutory <br />water conservancy district which includes within its boundaries most of the municipalities and <br />irrigated land in the Arkansas River Valley.. Southeastern has participated in numerous <br />proceedings in this Court relating to water issues, both as a party and as amicus. Southeastern <br />holds the water rights for the Fryingpan- Arkansas Project, a $550 million project authorized by <br />Congress and built by the U.S. Bureau of Reclamation under contract with Southeastern, which <br />diverts water underneath the Continental Divide, from the Fryingpan and Roaring Fork River <br />drainages, into the Arkansas River drainage, where Project water is stored in reservoirs. <br />Southeastern provides Project water and return flows to supplement the decreed water rights of <br />water users throughout the District. In an effort to prepare for the water needs of the growing <br />population in the Arkansas River basin and to help sustain water supplies for agricultural use, <br />Southeastern with participation from other Arkansas basin water providers, initiated Preferred <br />Storage Options Plan ( "PSOP ") in 1999. The PSOP Report, published September 21, 2000, <br />analyzed various options to meet the year 2040 water demand. The plan contemplates both <br />changed operations of existing Fryingpan- Arkansas Project reservoirs, as well as enlargement of <br />Pueblo and Turquoise Reservoirs. PSOP participants, as well as Southeastern, will rely on the <br />
The URL can be used to link to this page
Your browser does not support the video tag.