Laserfiche WebLink
TABLE OF CONTENTS(continued) <br /> Chapter <br /> Pate No. <br /> 2.3.2.8.5 Evaluation of the Technical and Economic <br /> Merits of Alternative 8 2-68 <br /> 2.3.2.9 Alternative 9-Citizens'Progressive Alliance Alternative 2-68 <br /> �' 2.3.2.9.1 Structural Component 2-68 <br /> i" 2.3.2.9.2 Non-Structural Component 2-68 <br /> 2.3.2.9.3 Environmental Impacts Associated with <br /> Alternative 9 2-71 <br /> 2.3.2.9.4 Evaluation of the Capability of Alternative 9 to <br /> Meet Purpose and Need Requirements of the <br /> Project 2-72 <br /> •2.3.2.9.5 Evaluation of the Technical and Economic Merits <br /> of Alternative 9 2-73 <br /> • <br /> 2.3.2.10 Alternative 10-No Action Alternative <br /> I <br /> 2.3.2.10.1 Environmental Impacts Associated with 2-73 <br /> • <br /> Alternative 10 2-75 <br /> 1 2.3.2.10.2 Evaluation of the Capability of Alternative 10 to <br /> Meet the Purpose and Need Requirements of the <br /> Project 2-75 <br /> 2.3.2.10.3 Evaluation of the Technical and Economic Merits <br /> of Alternative 10 2-76 <br /> 2.3.3 Summary of Strengths and Weaknesses of Each of the Alternatives <br /> 2.3.3.1 Alternative 1 -Administration Proposal 2-76 <br /> 2-76 <br /> 2.3.3.2 Alternative 2 -Administration Proposal with Recreation <br /> i Element Added <br /> 2.3.3.3 Alternative 3 -Administration Proposal with San Juan River 2-77 <br /> Basin Recovery Implementation Program Element Added <br /> I 2-77 <br /> 2.3.3.4 Alternative 4-Administration Proposal with San Juan River <br /> • Basin Recovery Implementation Program and Recreation <br /> Element Added <br /> 2.3.3.5 Alternative 5-Animas-La Plata Reconciliation Plan 2-78 <br /> 2-78 <br /> 2.3.3.6 Alternative 6-Animas River Citizen's Coalition Conceptual <br /> • <br /> Alternative <br /> • <br /> 2-79 <br /> 2.3.3.7 Alternative 7- 1996 Final Supplement to the Final <br /> Environmental Statement Recommended Action 2-79 <br /> 2.3.3.8 Alternative 8-Administration Proposal with an Alternative <br /> Water Supply for Non-Colorado Ute Indian Entities 2-80 <br /> 2.3.3.9 Alternative 9-Citizens'Progressive Alliance Alternative <br /> 2.3.3.10 Alternative 10-No Action Alternative 2-81 <br /> 2.3.4 Summary 2-81 <br /> ary of Alternatives Evaluation and Selection of Alternatives for Further <br /> Refinement and Study <br /> 2.3.4.1 Environmental Impact Summary 2-81 <br /> 2-82 <br /> 2.3.4.2 Purpose and Need Summary <br /> 2.3.4.3 Technical and Economic Summary 2-82 <br /> 2.3.4.4 Selection of Alternatives for Further Study 2-88 <br /> E y 2-88 <br /> 2.3.4.4.1 Refinements to Alternative 4 and Alternative 6 2-92 <br /> 2.4 Components of the Alternatives Considered but Eliminated from Further <br /> I• Consideration in this FSEIS <br /> 2.4.1 Non-Structural Components Eliminated as Part of Alternatives 1,2,3, 2-93 <br /> 4,6, 8and9 <br /> 4< <br /> 2-93 <br /> iv <br />