My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150307 Final Supplimental Impact Statement
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
C150307 Final Supplimental Impact Statement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2014 12:59:10 PM
Creation date
4/8/2014 3:04:00 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150307
Contractor Name
Animas La Plata
Contract Type
Loan
Loan Projects - Doc Type
Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
��� <br /> CHAPTER 1 <br /> INTRODUCTION,PURPOSE OF,AND NEED FOR THE PROJECT 1111 <br /> 'I' E <br /> Table 1-1 (continued) <br /> I I <br /> Provisions of the Colorado Ute Indian Water Rights Settlement Act'.' dli, '1 <br /> ' l <br /> The Ute Mountain Ute Tribe Received From this Source of Water For the Following Purpose <br /> Reserved water rights of: <br /> II <br /> 1,850 afy storage ' Stollsteimer Creek Agricultural irrigation <br /> 2 cfs' Stollsteimer Creek "I <br /> 3.5 cfse Stollsteimer Creek 1 <br /> Reserved water right for direct flow Piedra River Irrigation of 535 acres liti <br /> diversions of 1,595 afy` <br /> I <br /> Reserved water rights of: <br /> 183 afy i Devil Creek Irrigation of 81 acres y <br /> 1,530 afy` <br /> San Juan River Irrigation of 510 acres <br /> 975 afy` Round Meadow Creek Irrigation of 325 acres <br /> 1,372 afy` Cat Creek Irrigation of 482 acres <br /> Water right of 2,000 afy` In reservation Beneficial use of tributary <br /> groundwater for future individual <br /> domestic and livestock wells <br /> 'The Southern Ute Indian Tribe and the Ute Mountain Ute Tribe also have rights to 2013 afy and 1080 afy respectively that <br /> they have used under their historical irrigated acreage that is not included in the Colorado Ute Indian Water Rights Final y; <br /> Settlement Agreement. <br /> °Numbers shown in this table are for diversion and storage amounts. Allowable depletions are not shown. tI <br /> `This right has an 1868 priority date,but is subordinated to all rights with an adjudication date prior to 1985. In order for the <br /> Tribe to utilize any significant water from this right,a storage reservoir would be required to store any excess water that is not , <br /> utilized by water right holder with priority dates prior to 1985. The depletion allowance for this water right is not included in d <br /> the biological baseline for the San Juan River and Section 7 consultation on the use of the water may be required before the <br /> water could be put to use. <br /> °This right has an 1868 priority date,but is subordinated to all rights with an adjudication date prior to 1985. The depletion <br /> allowance for this water right is not included in the biological baseline for the San Juan River and Section 7 consultation on ;, <br /> ' ,- the use of the water may be required before the water could be put to use. <br /> `The depletion allowance for this water right is not included in the biological baseline for the San Juan River and Section 7 d <br /> consultation on the use of the water may be required before the water could be put to use. <br /> [1::,, fAs set forth in the 1930 federal decree and the 1934 state decree,except as modified by the Colorado Ute Indian Water <br /> Rights Final Settlement Agreement. <br /> gAs per Reservoir No. 1,Appropriation Priority No. 1965-1,decreed in Civil Action No. 1848-B,La Plata County. <br /> „ ' 'Storage right at Pargin Reservoir. 2"°refill right subordinated to 1986. The depletion allowance for this water right is not 1!. <br /> included in the biological baseline for the San Juan River and Section 7 consultation on the use of the water may be required <br /> a <br /> -- before the water could be put to use. <br /> This right has an 1868 priority date,but is subordinated to all rights with an adjudication date prior to 1986. The depletion <br /> allowance for this water right is not included in the biological baseline for the San Juan River and Section 7 consultation on <br /> the use of the water may be required before the water could be put to use. i; <br /> iThis right has an 1868 priority date,but is subordinated to all rights with an adjudication date prior to 1976. The depletion 1 <br /> allowance for this water right is not included in the biological baseline for the San Juan River and Section 7 consultation on <br /> .;< the use of the water may be required before the water could be put to use <br /> k <br /> 1-7 1.2 PROJECT HISTORY <br />
The URL can be used to link to this page
Your browser does not support the video tag.