My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150307 Final Supplimental Impact Statement
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
C150307 Final Supplimental Impact Statement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2014 12:59:10 PM
Creation date
4/8/2014 3:04:00 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150307
Contractor Name
Animas La Plata
Contract Type
Loan
Loan Projects - Doc Type
Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
N. <br /> analyze both alternatives on a commensurate or equivalent basis. As with Refined Alternative 4,Refined <br /> Alternative 6 also consists of two components: <br /> ❑ One component would be equivalent to the structural component of Refined Alternative 4 by <br /> developing up to 57,100 afy of depletions in the San Juan River Basin to serve essentially the <br /> same M&I needs as would be served by Refined Alternative 4. <br /> ❑ A second component for Refined Alternative 6 was developed under the assumption that water <br /> could be acquired to develop an equal amount of depletions of 13,000 afy and in a manner <br /> similar to Refined Alternative 4 by purchasing agricultural lands and associated water rights. <br /> For the first component of Refined Alternative 6,approximately 11,933 acres would be purchased to <br /> yield 17,432 afy of depletions. Other proposed sources of water for Refined Alternative 6 include: the } <br /> purchase of storage from Red Mesa Reservoir,the coordinated operation of existing reservoirs with <br /> streamflows in the San Juan Basin for more efficient utilization of water supplies, and the raising of <br /> Lemon Dam. <br /> '', Land(11,933 acres)and associated water rights would be purchased in the Pine,La Plata,and Mancos <br /> River Basins,and McElmo Creek Basin to supply a yield of 17,432 afy of historical depletions. This <br /> does not include the land required to supply the 13,000 afy depletions for the water acquisition fund. <br /> lip 1 <br /> ❑ Pine River Basin-A total of 10,000 acres of non-Colorado Ute irrigated land would be <br /> purchased in the Pine River Basin. The associated 15,114 af of average annual depletion would <br /> be removed from the land and allowed to flow into Navajo Reservoir under the same delivery <br /> pattern that would have occurred to the irrigated land. This would become project water with the <br /> r delivery point at Navajo Reservoir for purposes of administering the purchased water rights in <br /> ' the Pine River. <br /> �; ❑ La Plata River Basin-To meet the demands not met by available streamflow,a total of 785 acres <br /> of irrigated land would be purchased and the associated average annual depletion of 521 of <br /> r <br /> transferred to M&I use. <br /> ❑ Mancos River Basin-To meet the demands not met by available streamflow,a total of 500 acres <br /> of irrigated land would be purchased and the associated average annual depletion of 761 af <br /> transferred to M&I use. <br /> ❑ McElmo Creek Basin-A total of 648 acres, sufficient to provide a firm yield depletion of <br /> \ 1,036 af,would be purchased and the water transferred to M&I use to satisfy regional demand in <br /> Montezuma County. All water resulting from these purchases from McElmo Creek would be for <br /> l'' the benefit of the Ute Mountain Ute Tribe. <br /> Several federal storage facilities were evaluated for coordinated operation with streamflows in the San <br /> '''' Juan Basin for more efficient utilization of water supplies. Navajo Reservoir would be operated to <br /> supplement available Animas River flow in meeting the SJWC and Navajo Nation demand,the <br /> Farmington,Aztec and Kirtland regional water demands,and the demands for the non-binding uses at the <br /> i' coal mine,coal-fired power plant and gas-fired power plant for the Colorado Ute tribes. To the extent <br /> that capacity is not sufficient, additional irrigated acreage could be purchased and retired above the <br /> I,; reservoir to augment the water supply. Vallecito Reservoir would continue to operate as it has <br /> I historically,with any water transferred from irrigation to M&1 use delivered in the same pattern as would <br /> II! <br /> 11 normally occur for irrigation. Jackson Gulch Reservoir would be operated to store agricultural water <br /> ' purchased for conversion to M&I and release it according to demand as long as such operation did not <br /> Iii. impact the delivery of agricultural water to existing right holders. <br /> ES-8 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.