Laserfiche WebLink
List of Tables <br /> Pate No. <br /> 3.11-1 Average Monthly Distribution of Commercial Rafting Customers on the Animas <br /> River <br /> 3-175 <br /> 3.11-2 Comparison of Existing Ridgway Reservoir Recreation Facilities and Possible <br /> Recreation Facilities at Ridges Basin Reservoir 3-177 <br /> 3.11-3 Rafting User-Days on the San Juan River between Bluff and Clay Hills,Utah 3-185 <br /> 3.11-4 Projected Losses in Commercial Rafting by Floatable Days and Rafting User-Days on <br /> the Animas River under Refined Alternative 4 3-187 <br /> 3.11-5 Average Number of Days with Reduced River Miles Available for Commercial I <br /> Rafting or Take-Out Locations Downstream of 32nd Street under Refined <br /> Alternative 4 3-189 <br /> 3.11-6 San Juan River Near Bluff,Utah 3-193 <br /> 3.12-1 Base Case Value-Added Data for La Plata,Montezuma,and San Juan Counties 3-198 <br /> 3.12-2 Comparison of Retail Sales Sectors in La Plata County in 1997 3-202 <br /> 3.12-3 Comparison of Retail Sales Sectors in Montezuma County(1997 3-204 <br /> 3.12-4 Comparison of Retail Sales Sectors in San Juan County,New Mexico 3-206 <br /> 3.12-5 Economic Impacts for La Plata County Resulting from Construction of Structural <br /> Facilities for Ridges Basin Reservoir 3-208 <br /> 3.12-6 Economic Impacts for La Plata County Resulting from Construction of the Navajo I <br /> Nation Municipal Pipeline 3-209 <br /> 3.12-7 Top 10 Industries Impacted in San Juan County from Constructionof the Navajo I <br /> Nation Municipal Pipeline 3-209 <br /> 3.12-8 Estimated Construction Costs and Revenue Generation Resulting from Non-Binding I <br /> End Uses 3-211 <br /> 3.12-9 Economic Impacts for La Plata County for Construction of Structural Modifications I <br /> to Lemon Reservoir 3-212 <br /> 3.12-10 Estimated Changes in Agricultural Revenues by County 3-212 I <br /> 3.13-1 Durango Planning Area Existing Land Uses 3-220 <br /> 3.15-1 Assumptions Used in Identifying Construction-Related Traffic ImpactsAssociated <br /> with the Structural Components of Refined Alternative 4 3-235 <br /> 3.15-2 Estimated Additional Ridges Basin Facilities Construction Peak Hour Commute <br /> Trips at thelntersection of West Frontage Road and County Road 211 3-239 <br /> 3.15-3 Estimated Additional Ridges Basin Facilities Construction Peak Hour Commute <br /> Trips at the Intersection of U.S. 550/160 and West Frontage Road 3-240 <br /> 3.15-4 2020 Recreation Visitation Impacts on Wildcat Canyon Road(CR 141) 3-243 ' <br /> 3.16-1 Summary of Total Daily Construction Emissionsfrom Construction of Ridges <br /> Basin Dam,Durango Pumping Plant,and Ridges Basin Inlet Conduit 3-250 <br /> 3.16-2 Summary of Total Daily Construction Emissionsfrom Construction of Navajo Nation <br /> Municipal Pipeline 3-250 <br /> 3.16-3 Summary of Total Daily Construction EmissionsFrom Enlargement of Lemon Dam 3-254 <br /> 3.17-1 Permissible Noise Intensities from Stationary Sources in Durango and Farmington 3-257 <br /> 3.17-2 Typical Construction Equipment Noise Intensities 3-260 <br /> 3.21-1 Summary of Impacts for Refined Alternative 4 and Refined Alternative 6 3-287 <br /> 4-1 Southern Ute Indian Tribal Lands 4-20 <br /> 4-2 Ute Mountain Ute Lands 4-20 <br /> 5-1 Water Supply and Costs-Preferred Alternative 5-8 <br /> 5-2 Total Costs for Preferred Alternative 5-9 <br /> 6-1 Agencies and Organizations that Participated in the ALP Project Consultation and <br /> Coordination Process 6-4 <br /> 7-1 Federal, State and Local Permit Approval and Consultation Requirements 7-5 <br /> F <br /> xxv <br />