Laserfiche WebLink
i List of Maps <br /> Page No. <br /> I ¢ <br /> 1-1 General ALP Project Area 1-3 <br /> = t 2-1 Possible Locations of Colorado Ute Tribe Non-Binding M&I Water End Uses 2-5 <br /> 2-2 Re-evaluated Potential Water Storage Locations 2-17 <br /> 2-3 Location of Irrigated Agricultural Lands with Potential to be Purchased for <br /> Acquisition of Water Rights 2-31 <br /> 2-4 Location of Existing Federal Water Projects within the ALP Project Area 2-51 <br /> 1 2-5 Location of Structural Components of Refined Alternative 4 2-103 <br /> 11,q:; 2-6 Location of Proposed Durango Pumping Plant 2-107 <br /> 2-7 County Road 211 Potential Relocation Routes and Potential Recreation <br /> 1I1 Facilities Locations 2-113 <br /> l.` 2-8 Potential Water Conveyance Routes for Non-Binding Tribal M&I Water End Uses <br /> Under Refined Alternative 4 2-119 <br /> co <br /> 2-9 Potential Water Conveyance Routes for Non-Binding Tribal M&I End Uses Under <br /> j Refined Alternative 6 2-141 <br /> 2-10 Navajo Nation Municipal Pipeline Alternatives 2-149 <br /> ll, ' <br /> 111j, <br /> III <br /> I!j <br /> XX <br /> ?ITC <br />