My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150307 Final Supplimental Impact Statement
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
C150307 Final Supplimental Impact Statement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2014 12:59:10 PM
Creation date
4/8/2014 3:04:00 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150307
Contractor Name
Animas La Plata
Contract Type
Loan
Loan Projects - Doc Type
Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TABLE OF CONTENTS(continued) <br /> Chapter Page No. <br /> 3.20.2.1 Evaluation Methodology 3-279 <br /> 3.20.2.2 Significance Criteria 3-279 <br /> 3.20.3 Affected Environment 3-280 <br /> 3.20.3.1 Durango Pumping Plant and Ridges Basin Inlet Conduit 3-280 <br /> 3.20.3.2 Ridges Basin Dam and Reservoir 3-281 <br /> 3.20.3.3 Navajo Nation Municipal Pipeline 3-281 <br /> 3.20.3.4 Lemon Dam and Reservoir 3-281 <br /> 3.20.3.5 Areas West of Ridges Basin 3-281 <br /> 3.20.3.6 Areas East of Ridges Basin 3-282 <br /> 3.20.4 Environmental Consequences and Mitigation 3-282 <br /> 3.20.4.1 Refined Alternative 4 3-282 <br /> 3.20.4.1.1 Structural Component 3-282 <br /> 3.20.4.1.2 Non-Binding End Uses and Conveyance <br /> Corridors Impacts 3-284 <br /> 3.20.4.2 Refined Alternative 6 3-285 <br /> 3.20.4.2.1 Structural Component 3-285 <br /> 3.20.4.2.2 Non-Structural Component 3-285 <br /> 3.20.4.2.3 Non-Binding End Uses and Conveyance <br /> Corridors 3-285 <br /> 3.20.4.3 No Action Alternative 3-286 <br /> 3.21 SUMMARY OF IMPACTS FOR REFINED ALTERNATIVE 4 AND <br /> REFINED ALTERNATIVE 6 3-286 <br /> 4 OTHER IMPACT CONSIDERATIONS 4-1 <br /> 4.1 GROWTH-INDUCING IMPACTS • 4-1 <br /> 4.2 CONNECTED,CUMULATIVE,AND RELATED <br /> ACTIONS 4-1 <br /> 4.2.1 Navajo Reservoir Operation and the San Juan River Basin Recovery <br /> Implementation mentation <br /> Program <br /> 4-2 <br /> 4.2.1.1 Background Information 4-2 <br /> 4.2.1.2 Relationship of Operation of Navajo Reservoir to the <br /> Animas-La Plata Project 43 <br /> 4.2.1.3 Navajo Operation Environmental Impact Statement 4-4 <br /> • 4.2.2 Navajo Indian Irrigation Project 4-4 <br /> 4.2.3 Jicarilla Apache Tribe Water Rights Settlement 4-5 <br /> 4.2.4 Navajo-Gallup Water Supply Project 4-6 <br /> 4.2.5 Restoration of the Navajo Hogback Project 4-6 <br /> 4.2.6 San Juan Basin Coalbed Methane Gas Development 4-7 <br /> 4.2.7 Colorado Transportation Improvement Projects 4-7 <br /> 4.3 CUMULATIVE IMPACTS 4-8 <br /> 4.3.1 Operation of Navajo Dam 4-8 <br /> 4.3.2 Navajo Indian Irrigation Project 4-9 <br /> 4.3.3 Navajo River Water Development Plan(Jicarilla Apache Tribe) 4-9 <br /> 4.3.4 San Juan Basin Coalbed Methane Gas Development 4-9 I <br /> 4.3.5 Future Indian Water Development 4-10 <br /> 4.3.6 Colorado Transportation Improvement Projects 4-10 <br /> 4.4 RELATIONSHIP BETWEEN SHORT-TERM USES VERSUS LONG-TERM <br /> PRODUCTIVITY 4-11 <br /> 4.4.1 Introduction 4-11 <br /> 4.4.2 Long-term Benefits and Productivity 4-11 <br /> xvii <br />
The URL can be used to link to this page
Your browser does not support the video tag.