Laserfiche WebLink
RED MESA RESERVOIR ENLARGEMENT <br /> STATUS and CONCLUDING REPORT <br /> TABLE OF CONTENTS <br /> CHAPTER PAGE <br /> Summary of Findings 1 - 2 <br /> 1.0 Introduction 3 <br /> 2.0 Study Objective - Purpose and Needs 3 <br /> 3.0 Red Mesa Ward Reservoir and Ditch Company 6 <br /> 4.0 Previous Studies 8 <br /> 5.0 Study Area Description 9 <br /> 6.0 Water Demands 10 <br /> 7.0 Project Lands 12 <br /> 8.0 Hydrology and Water Rights 12 <br /> 9.0 Water Quality 18 <br /> 10.0 Field Investigations 18 <br /> 11.0 Evaluation of Alternatives 19 <br /> 11.1 Repair Alternative <br /> 11.2 Enlargement Alternative <br /> 12.0 Description of Selected Plan 21 <br /> 12.1 Inlet Ditch 21 <br /> 12.2 Outlet Works 22 <br /> 12.3 Spillway 23 <br /> 12.4 Embankment 24 <br /> 12.5 Land and Rights 25 <br /> 12.6 Permitting 26 <br /> 12.7 Project Costs 26 <br /> 12.8 Implementation Schedule 26 <br /> 12.9 Financing Plan 27 <br /> 12.10 Wetlands 28 <br /> 12.11 River Basin Depletion 28 <br /> 13.0 Conclusions and Recommendations 32 <br />