• <br /> 1.-Th\Smith <br /> ®ot®chnfcai <br /> ENGINEERING CONSULTANTS <br /> Consistent with the"Advanced"method outlined by the Colorado Dam Safety Branch,cross-sections for <br /> the hydraulic modeling of the critical cross-sections will be generated from the topographic mapping <br /> provided by the cities,towns and counties impacted and digitized USGS maps. This elevation information <br /> will be used in AutoCAD to develop ground elevations for cross sections along the affected path. We have <br /> assumed the existing mapping will be sufficient to conduct this analysis. If additional topographic <br /> surveys are required this will be considered additional work and has not been included in our proposal. <br /> Using the compiled geometric data,Smith Geotechnical will integrate the physical cross sections with the <br /> stream hydraulic characteristics. This will be utilized to produce an accurate representation of flows in <br /> the channel using the HEC-RAS software program. The information from HEC-RAS will be exported back <br /> into AutoCAD and Arc View for assistance in generation of the inundation map that meets the State <br /> Criteria. <br /> The final deliverable will be a letter report documenting our processes,methods,and assumptions and the <br /> generated inundation maps. The inundation maps will include the extents of the dam breach flood wave, <br /> cross sections at critical sections indicating horizontal and vertical flood extents,flood wave velocity,and <br /> the flood wave arrival time. The mapping will begin at Hamilton reservoir(Rawhide Dam)and extend <br /> downstream to a point where no potential for loss of life and no significant property damage is expected, <br /> as indictated in the proposed scope of work these anticipated location is the along the South Plate East of <br /> Greeley Colorado. <br /> FINAL DELIVERABLES <br /> Smith Geotechnical will prepare and submit separate copies of the final deliverables for the Rawhide <br /> dam as follows: <br /> • Letter report for inundation mapping analysis. <br /> • Ten(10)hard copies of the inundation maps. <br /> • Two(2) DVD's containing: <br /> o Shapefiles of the inundation limits. <br /> o PDF files of, Inundation maps,and Supporting spreadsheets. <br /> O Hydraulic/Hydrologic models. <br /> CONTRACT PROPOSAL <br /> Smith Geotechnical is proposing a Lump Sum Contract for a total of$14,920. This total cost will include all <br /> work described in the above sections. We have included a detailed spreadsheet which summarizes the <br /> expected scope of work and the cost associated with each component. <br /> We look forward to a favorable response to our proposal and look forward to the opportunity to work with you. <br /> If you have any questions, please feel free to call either Mr. Clint Brown or Mr. Duane Smith at 970-490- <br /> 2620. <br /> Sincerely, <br /> Smith Geotechnical Engineering,Inc. <br /> Duane Smith, P.E.,President <br /> Rawhide Dam. Inundation Mapping <br />