Laserfiche WebLink
• <br /> PINE RIVER IRRIGATION DISTRICT <br /> uPLLEC11.0 13029 COUNTY ROAD 501 <br /> BAYFIELD CO 81122 <br /> (303) 884.2558 ORGANIZED 1938 <br /> October 16, 1996 <br /> Daries "Chuck" Lile, Director <br /> Colorado Water Conservation Board <br /> 1313 Sherman Street <br /> Denver, Colorado 80203 <br /> Dear Mr. Lile: <br /> The Pine River Irrigation District(PRID) is respectfully submitting this loan application for the <br /> raw water facilities to convey water from Vallecito Reservoir to a proposed water treatment <br /> plant. PRID is in the process of providing water to a rural water system, the newly formed <br /> Vallecito Water Company, which may serve an area as large as the eastern half of LaPlata <br /> County eventually. PRID plans to construct and own the raw water facilities and the water <br /> treatment plant then will sell treated water to the Vallecito Water Company who will construct <br /> and own the distribution pipelines. <br /> Attached is the feasibility study prepared for PRID by Steve Harris of Harris Water Engineering <br /> (303-259-5322) in Durango, feel free to contact him or myself if you have any questions. <br /> The report describes the raw water facilities and the estimated project cost of$455,000 based on <br /> construction in 1997. Financing for the other facilities will be obtained from other sources. <br /> PRID requests that the CWCB authorize and appropriate the funds but not provide the funds until <br /> financing for the other project components is also obtained. <br /> Once again,thanks for the help. <br /> Since y, <br /> 0-62 / <br /> Robert Witt, President <br /> Pine River Irrigation District • <br /> enclosures <br />