My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Fesability Study
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
Fesability Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2014 11:01:56 AM
Creation date
4/1/2014 11:01:07 AM
Metadata
Fields
Template:
Loan Projects
Contractor Name
Pine River Irrigation District
Contract Type
Loan
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
COLLATERAL <br /> PRID proposes to not obtain the $300,000 requested from CWCB for pre-construction designs <br /> until Rural Development has agreed that there is an adequate number of taps to begin <br /> construction. In this manner, construction of the rural water system should be assured and the <br /> resulting revenue stream from tap fees and water sales. <br /> VWC would offer to provide any one of the following for collateral: <br /> 1. Project facilities. <br /> 2. Tap fees. <br /> 3. Water Sales. <br /> INSTITUTIONAL CONSIDERATIONS <br /> The PRID may need to obtain an approving vote of the shareholders prior to completing the <br /> contract for the loan. <br /> OPINION OF FEASIBILITY <br /> The selected alternative is technically and financially feasible. There are no significant <br /> roadblocks once sufficient taps are committed to meet USDA Rural Development requirements . <br /> 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.