Laserfiche WebLink
Contents <br /> Tables <br /> Table Page <br /> 1-1 State of New Mexico schedule of anticipated Upper Basin depletions <br /> (May 2006) 1-7 <br /> II-1 Projected population in the proposed project service area by basin I1-3 <br /> II-2 Municipal water demand by basin for the proposed project(2020) II-4 <br /> I1-3 Municipal water demand by basin for the proposed project(2040) I1-5 <br /> 1I-4 Chapter water demand for the proposed project(2020) II-6 <br /> II-5 Chapter water demand for the proposed project(2040) II-8 <br /> I1-6 Projected municipal demand(excluding Navajo Agricultural <br /> Products Industry) in the proposed project service area by basin II-10 <br /> II-7 Population projections for the Jicarilla Apache Nation II-13 <br /> II-8 Projected water needs for the Jicarilla Apache Nation II-14 <br /> III-1 Regional municipal water production during 2005 III-11 <br /> IV-1 General summary of components IV-10 <br /> IV-2 Gallup Regional System IV-10 <br /> IV-3 Application of the viability tests IV-21 <br /> IV-4 Present worth of alternatives IV-22 <br /> IV-5 Alternative selection criteria (May 14, 2003) IV-25 <br /> IV-6 Alternative comparison for environmental factors (May 14, 2003) IV-26 <br /> V-1 New Mexico permits held by the United States V-8 <br /> V-2 Preliminary list of San Juan River water rights between Navajo Dam <br /> and the Animas River confluence V-9 <br /> V-3 Baseline and current depletion summary within the Basin V-11 <br /> V-4 Navajo Reservoir content and releases for the alternatives V-16 <br /> V-5 Summary of major existing and future Tribal uses of Basin water V-22 <br /> V-6 Historical (1950-98)water quality measurements on the <br /> San Juan River V-35 <br /> V-7 Acres of affected vegetation within the proposed project area V-47 <br /> V-8 Fishes documented in the Basin V-59 <br /> V-9 Summary of flow statistics for the SJRPNM Alternative V-68 <br /> V-10 Threatened or endangered species(section 7) V-73 <br /> V-11 Estimated angler use below Navajo Reservoir V-97 <br /> V-12 Land ownership within the project area V-103 <br /> V-13 Land ownership within 500 feet of the SJRPNM Alternative <br /> pipeline route V-105 <br /> V-14 Land ownership within 500 feet of the NIIP Amarillo Alternative <br /> pipeline route V-106 <br /> ix <br />