My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Planning Report & Environmental Impact
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
Planning Report & Environmental Impact
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2014 3:02:32 PM
Creation date
4/1/2014 10:37:18 AM
Metadata
Fields
Template:
Loan Projects
Contractor Name
Navaho-Gallup Water Supply Project
Contract Type
Loan
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
464
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Contents <br /> Page <br /> Chapter IV — Alternatives (continued) <br /> Nonstructural Alternatives IV-4 <br /> Water Conservation IV-4 <br /> Water Re-Use IV-5 <br /> Structural Alternatives IV-5 <br /> Introduction IV-5 <br /> Basic Design Considerations IV-6 <br /> Conjunctive Use of Groundwater and Aquifer Storage IV-7 <br /> Delivery Data IV-8 <br /> Commonalities of the Structural Alternatives IV-9 <br /> Surface Water Diversions IV-11 <br /> NIIP Alternatives IV-11 <br /> San Juan River Alternatives IV-11 <br /> Description of the Alternatives IV-13 <br /> NIIP Moncisco Alternative IV-13 <br /> NIIP Cutter Alternative IV-14 <br /> NIIP Coury Lateral Alternative IV-14 <br /> NIIP Amarillo Alternative IV-15 <br /> SJRPNM Alternative 1V-15 <br /> San Juan River Infiltration Alternative IV-16 <br /> Overall Operational Configuration IV-16 <br /> Other Alternative Cost Attributes IV-18 <br /> Land, Relocations, and Damages IV-18 <br /> Environmental Mitigation IV-19 <br /> Cultural Resources IV-19 <br /> Screening Process IV-19 <br /> The Principles and Guidelines IV-20 <br /> The Four Tests of Viability IV-20 <br /> The Four Accounts IV-21 <br /> Comparative Total Costs of the Alternatives IV-21 <br /> Alternatives Comparison and Weighting IV-23 <br /> Comparison of Alternatives by All Factors IV-24 <br /> Alternatives Considered but Eliminated IV-27 <br /> Nonstructural Alternatives Eliminated IV-27 <br /> Structural Alternatives Eliminated IV-28 <br /> Preferred Alternative Selection IV-29 <br /> Chapter V — Affected Environment and Environmental <br /> Consequences <br /> Introduction V-1 <br /> Setting V-2 <br /> Navajo Reservoir Operations V-3 <br /> • <br /> iii <br />
The URL can be used to link to this page
Your browser does not support the video tag.