Laserfiche WebLink
Navajo-Gallup Water Supply Project <br /> Table S-3.—Yearly OM&R costs ($) (SJRPNM Alternative) <br /> Gallup <br /> San Juan Cutter Regional <br /> Item Lateral Lateral System <br /> NTUA power costs (relift pumping plant) 4,962,000 597,000 82,000 <br /> CRSP power costs (relift pumping plant) 1,678,000 202,000 28,000 <br /> NTUA power costs (booster pumping plant) 215,000 35,000 <br /> CRSP power costs (booster pumping plant) 73,000 12,000 — <br /> Re lift pumping plant OM&R 1,796,000 693,000 359,000 <br /> Booster pumping plant OM&R 73,000 14,000 <br /> Canal OM&R — 32,000 — <br /> NTUA power cost water treatment plant 511,000 63,000 — <br /> CRSP power cost water treatment plant 171,000 20,000 — <br /> Water treatment OM&R 2,602,157 $1,038,750 — <br /> NTUA water treatment, miscellaneous 10% 311,000 $110,000 <br /> CRSP water treatment, miscellaneous 10% 277,000 $106,000 <br /> Power transmission OM&R 630,000 Included in <br /> San Juan <br /> Lateral <br /> Pipeline OM&R 619,000 153,000 32,000 <br /> Total NTUA 11,719,157 2,735,750 473,000 <br /> Total CRSP 7,919,157 2,270,750 419,000 <br /> Notes: (1)CRSP rate is 9.5 mils per kilowatthour and demand charge of$4.04 per kilowatt per month. <br /> (2)CRSP total project power cost is$2,184,000. <br /> (3) NTUA rate is 20 mils per kilowatthour and demand charge of$16.50 per kilowatt per month. <br /> (4) NTUA total project power cost is$6,465,000. <br /> (5)Cost reflects March 2005 project cost estimate with January 2005 price level. <br /> WATER SUPPLY <br /> Water for the Navajo Nation's use in New Mexico would be supplied from the State of <br /> New Mexico's Upper Basin apportionment, and water for the Navajo Nation use in <br /> Arizona would be supplied from the consumptive use apportionments made to the State <br /> of Arizona by compact or decree. Navajo Nation uses by the project in both States must <br /> S 8 <br />