Laserfiche WebLink
CWCB Construction Fund Loan Application <br /> 4. Please provide a brief description of the owner's existing water supply facilities and describe any <br /> existing operational or maintenance problems. Attach separate sheets if needed, and a map of <br /> the service area. Direct Flow of 795 cfs <br /> For existing facilities indicate: <br /> Number of shareholders 1336 or Number of customers served <br /> Current Assessment per share$ 14.50 Number of shares 33284 <br /> Number of acres irrigated Water Right: CFS. <br /> Average water diverted per year: 128 k acre-feet. <br /> Part B.-Description of the Project <br /> 1. Name of the project or facility May Pipeline Project <br /> 2. Purpose of this loan application. Check one. <br /> New project <br /> x Rehabilitation or replacement of existing facility <br /> Enlargement of existing facility <br /> Emergency Repair <br /> Other(describe) <br /> 3. If the project is for rehabilitation of an existing reservoir, is the reservoir currently under a <br /> storage restriction order from the State Engineer?YES __ NO <br /> 4. General location of the project. (Please include county, and approximate distance and direction <br /> from nearest town,as well as legal description,if known. Montezuma County, <br /> approximately 5 miles north of Cortez Colorado <br /> 5. Please provide a brief narrative description of the proposed project including purpose, need, <br /> facilities,type of water uses to be served and service area.Attach separate sheet, if needed. <br /> Replace open ditch with new pipeline , to increase <br /> water delivery efficiency and expansion of service <br /> area . <br /> 2 <br />