Laserfiche WebLink
SCHEDULE, BUDGET, AND RESPONSIBILITIES <br />The 1975 Assessment is scheduled to be completed by the end of 1975 at a total direct cost of <br />$6.5 million. Figure 2 depicts the step -by -step flow of assessment activities over the 30 -month time <br />schedule. <br />Overall direction of the effort will be provided by the Water Resources Council's National <br />Programs and Assessment Committee. The Assessment itself will be accomplished by the coopera- <br />tive activities of State, regional, and Federal agencies, with regional activities coordinated and con- <br />ducted by selected Regional Sponsors representing each of the Council's 21 water resource regions. <br />Activity <br />Months <br />0 3 6 9 12 15 18 21 24 27 <br />Literature Review and Regional Work Plans <br />Step 02A— Nationwide Adequacy Analyses <br />Component 1: (Volumetric Supply and Requirements) <br />Component 2: (Non- Volumetric.Supply and Requirements) <br />Component 3: (Effects of Flow Augmentation and <br />Changing Water Use Patterns) <br />Step 026— Specific Problem Analysis <br />Task 1: (User Awareness and Needs Survey) <br />Task 2: (Problem Identification Survey and Report) <br />Task 3: (Problem Authentication) <br />Step 02C— Information Compilation <br />Step 03— Problem Severity and Urgency Rating <br />Step 04— Recommendations <br />1975 Assessment Report <br />Preparation <br />Review <br />Environmental Impact Statement <br />Preparation <br />'Review <br />Figure 2.— Schedule of 1975 Assessment activities <br />2 <br />