Laserfiche WebLink
'N <br />%.oWLA L11 Is <br />(status) <br />u re <br />• #3 (medium unit) and #5 (large unit) have been <br />removed from the plant and transported to a shop in <br />Farmington. (All American Technical Team) <br />• The top casings have been removed and the coating <br />inspected <br />• Catastrophic coating failure did occur <br />• USBR has prepared a coating materials matrix for <br />selecting a product to replace the failed coating <br />• USBR will select three coatings for testing <br />