My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ALPOM&R meeting 2/7/11
CWCB
>
ALP Project
>
ALPOM&R meeting 2/7/11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2016 1:49:01 PM
Creation date
3/13/2014 3:13:20 PM
Metadata
Fields
Template:
Animas La Plata Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DEMAND CHARGE: $5.22/kilowatt of billing demand. <br />ENERGY CHARGE: 12.29 mills/kilowatthour of use. <br />Actual Power Consumed at Meter <br />Small Unit -.87 Mw <br />Medium Unit - 1.67 Mw <br />Large Unit - 3.33 Mw <br />Energy= Unit Mw x 24 hours x 1000 x.01229 x# of days <br />* Demand = Unit Mw + 0.5 x 1000 x 5.22 x # of months <br />1 month = 30.4 days <br />* When calculating peak demand charges add 0.5 Mw higher than meter reading <br />Evaporation Replacement Costs for 2700 a/f <br />Energy <br />Demand <br />Total <br />14 cfs = 27.76 a/f per day $550.73 per day <br />$24,958.39 <br />$28,605.60 (4 mons.) <br />$53,563.99 <br />97.26 days to pump 2700 a/f <br />28 cfs = 55.52 a/f per day J $958.44 per day <br />f <br />$23,954.32 <br />$22,654.80 (2 mons.) <br />$46,609.12 <br />48.63 days to pump 2700 a/f <br />56 cfs = 111.05 a/f per day $1804.62 per day <br />$23,877.69 <br />$19,992.60 (lmon) <br />$43,870.29 <br />24.31 days to pump 2700 a/f <br />Evaporation Replacement Costs for 5,400 a/f <br />Energy <br />Demand <br />Total <br />14 cfs = 27.76 a/f per day $513.97 per day <br />$49,916.79 <br />$50,059.80 (7 mons.) <br />$99,976.59 <br />194.52 days to pump 5400 cfs <br />28 cfs = 55.52 a/f per day $958.44 per day <br />$47,908.64 <br />$45,309.60 (4 mons.) <br />$93,218.24 <br />97.26 days to pump 5400 a/f <br />56 cfs = 111.05 a/f per day $1804.45 per day <br />$47,765.20 <br />$39,985.20 (2 mons.) <br />$87,750.40 <br />48.63 days to pump 5400 a/f <br />Lake Elevation <br />Full 6882 <br />Minus 2700 a/f = 6880 <br />Minus 2700 a/f = 6878 <br />Total Volume a/f <br />121,070 <br />118,370 <br />115,670 <br />Drop in Elevation <br />0 feet <br />2 feet <br />4feet <br />Surface Acres <br />1495 <br />-14 <br />1481 <br />-30 <br />1465 <br />
The URL can be used to link to this page
Your browser does not support the video tag.